My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
14175
>
2300 - Underground Storage Tank Program
>
PR0234383
>
COMPLIANCE INFO_1992-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:35 AM
Creation date
11/7/2018 12:04:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992-2005
RECORD_ID
PR0234383
PE
2361
FACILITY_ID
FA0003670
FACILITY_NAME
REYNOLDS PACKING CO QUALITY BIN
STREET_NUMBER
14175
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
051-050-05
CURRENT_STATUS
02
SITE_LOCATION
14175 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\T\HWY 26\14175\PR0234383\COMPLIANCE INFO 1992-2005.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/03/2007 22: 49 Fly 209533265o ALLTECH PETRO INC LIA SAIL JOAQUIN <br /> IN01 <br /> Facility: Linden Associated Growers Page 2 <br /> D. Results of Testing/Servicing <br /> Sot"tware Version Installed: N/A <br /> Complete the rollo ing checkllst: <br /> ®Yes ❑ No is the audible alann operational' <br /> 0 Yes ❑ No* le the visual uhu-ni operational? <br /> ❑ Yes [] No* Is the print function o.erational- Not installed. <br /> ❑Yes ❑ Nes* Ware all sensors visually inspected,functionally tested,and contemned operational? <br /> Yee ❑ No" Were all sensors installed at lowest point of secondary containinent and positioned No that other uquipinent will <br /> riot interfarc with their proper operation'? <br /> ❑ Yes ❑ No* If alaniis are relayed to a remote inonitoritlg station, is all communications equipmcnt (e,g. nindem) <br /> 21 N/A operational? <br /> ❑ Yes ❑ No* For pressurized piping systems,does the tin-bine automatically Shut down if the piping secondary containment <br /> N/A monitoring system detects a leak,fails to operate,or is electrically disconnected'? If yes:which sensairs initiat,c <br /> positive shut-down? (C'heck all that apply) [] Siunp/Treneh Sensors, ❑Dispenser Contanmicnt Sensors. <br /> Did you confirm positive shut-down dtw to leaks and sensor failure/disconneulion? 0 Yes; Lj No. <br /> ElYes ElNo* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ❑ NIA mechanical overfill prevention valve is installed), is the overfill waraung alarm visible and audible at the tank <br /> till point(s and u tc.Ttiting properly? If so,at what percent of tank capacity docs the alarm trigger? <br /> Z Yes* ❑ No Was any monitoring,equipment replaced? If yes,identify Specific sexisors,probes,or other ccltaipment replaced <br /> and list the manufacturer name and model for all rc lacement parts in Suction E,below. <br /> ® Yes* Q No Was liquid found inside any secondary containment systems designed as dry, systems'? (Chock all that apply) <br /> ❑ Product Witter. If yes,describe carries in Section T,below. <br /> ® Yes Noll Was monituEjag system set-tip reviewed to ensure proper settings?Attach sot up re ioi,LK,if applicable <br /> Z Yes 0 No* Is all monitoring equipment u erational per manufacttat'er's s iecificatiom? <br /> " In Section E below,describe how and when these defletencies were or will be corrected. <br /> E. Comments: When we arrived the slab in front of the pump house had recently been Pressure washed. We <br /> discussed with the property management the issues involved and told them of the correct procedures.* wash with <br /> a detergent or emulsitler And catch the rinsate with an:►bsorhent. Dispose of the absorbent as hazardous waste. <br /> F. The piping at this site is a straight-up system with double wall piping up to the pumping unit. <br /> G. The ILS-2341 is a very basic system and Is not capable of providing Positive+Shut Down(PSD). Wo tried. <br /> FI- The sewor disconnect alarm duos work (it lights an LED on the front panel and beeps) but again, it does not <br /> provide PSD. <br /> 1. There is a delay period between the activating of as liquid sensor and the sounding of the alarm. With the liquid <br /> sensors it is around five minutes. For iensnr disconnect it is around 13 minutes. <br /> J. ne pressure washing of the dispensers was responsibic for putting some water into the Under Dispenser <br /> Containment(UDC)of the gasoline pump, it was removed with the shop vac and,along with the water from the <br /> fillspill bucket tests,was placed into the Waste Antifreeze barrel in hack of the shop. <br /> K. When we left all alarm lights were out and it was as close to "AAI Functions Normal" as you can get with an old <br /> II,S-2�t1. <br /> Page I of 3 o3ltat <br />
The URL can be used to link to this page
Your browser does not support the video tag.