My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
14175
>
2300 - Underground Storage Tank Program
>
PR0234383
>
COMPLIANCE INFO_1992-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:35 AM
Creation date
11/7/2018 12:04:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992-2005
RECORD_ID
PR0234383
PE
2361
FACILITY_ID
FA0003670
FACILITY_NAME
REYNOLDS PACKING CO QUALITY BIN
STREET_NUMBER
14175
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
051-050-05
CURRENT_STATUS
02
SITE_LOCATION
14175 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\T\HWY 26\14175\PR0234383\COMPLIANCE INFO 1992-2005.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• . SAN JG IN COUNTY ENVIRONMENTAL HEALT EPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN — PAGE I (One form per facility) <br /> TYPE OF ACTION ,q 1.NEW PLAN © 2.CHANGE OF INFORMATION RUQ <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> FAC1Lff NAME <br /> Rnz <br /> FACILITY SITE ADDRESS / R03. CITY Roo, <br /> � / GZ <br /> II. §PILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc,)and, if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste, <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,ctc. <br /> will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> M. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary, <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly ifapplicable) <br /> EQUIPMENT LOCATION iAVAILABILITY <br /> -, R10. R20. <br /> 4 CLAsn. <br /> G/c — <br /> RII. J - R21_ <br /> G R31. <br /> RI2. R22, R.32. <br /> R13, R23. <br /> / R33 <br /> R24. ` <br /> R33 <br /> R15. R25. <br /> ttft R35, <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40. TITLE R50. <br /> NAME <br /> RAI. TITLE R51 <br /> n;�' T <br /> NAME Rd2. TITL Rsz. <br /> NAME <br /> A43. TITLE <br /> R53 <br /> V. INDIRECT HAZARD DETERIVIINATION <br /> This information is required only when the presence of the hazardous substance can not he determined directly by the monitoring method used(e.g.,where liquid level <br /> measurements in a tank annular space or secondary piping are used as the basis for leak determination). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> SJCEHD-e(06!03)-113 <br /> 06/25/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.