Laserfiche WebLink
Ne 1f t" 4S4r2-/C, ✓ rg 9- 6 - 88 <br /> Nam.of S.PWrar,owner or Deabr Address, No.and Stmid.) Chy Sulo 0.1.of Test <br /> a� 15. TANK TO TEST 16. CAPACITY From <br /> xlmala V P 7 _] SO By most accurate Station CMrt <br /> Nominal Capacity- capacity chan available-56d r, Tank Manufacturer's Chart <br /> EJ <br /> OIdentify by Position canons venom u Company Engineering Data <br /> D' S c L <br /> Is them doubt as to True Capacity 7 El E] Chans supplied with P_tL <br /> !::;a <br /> Draw*W Grade Sae Section"DETERMINING TANK CAPACITY" � Other pre <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to N In. Gallons as.Reading <br /> Stick Water Bottom �y �1 p <br /> before FIIFtfp '-Cl _ -� Inventory d 1 /Z `� 8 b a s O <br /> to%in. Gallons <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> top o FG � <br /> to Tank Diameter L� C Product in full tank(up to fill pipe) .- <br /> 0. <br /> / J <br /> 00 0 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK q P G 3 D'S VAPOR RECOVERY SYSTEM <br /> =><N A P1 T ?Z ` <br /> n 00>0 See manual sections applicable.Check below and record procedure in log(26). El stage I <br /> — <br /> zccgPT 3z,7 <br /> K o :6 E] WaterIn tank E] High water table In tank excavation [-] Line(s)being tested with LVLLT El stage II <br /> Dim <br /> N 21. TEMPERATURE/VOLUME FACTOR (a)TO TEST THIS TANK 1 <br /> 19. TANK MEASUREMENTS FOR <br /> p TSTT ASSEMBLY Is Today Warmer? ; Colder? —°F Product in Tank—�°yF fill-up Product on Truck F Expected Change( +or - ) <br /> Bottom of tank to Crede " <br /> Vp ����"'"'""""" 22. Thenna45ensor reading after circulation - <br /> Add 30"for Y'l ................. �3 0 _" digns Nearest <br /> Add 24"for 3"L or air seal....... 23. Digits per°F in range of expected change -3 /Y <br /> 1 Total tubing to assemble Approximate alga. <br /> 20. EXTENSION HOSE SETTING24. 5 6 x ho 0 4141905 _D JSSS O /Y-5 gallons <br /> �/ total quantity in coefficient of expansion for volume change in this tank <br /> Tank top to grade*.................................. 3S lull tank(16 or 17) involved product per°F <br /> Extend how on suction tube 6-or more <br /> below tank top ................... ..._............ q0 „ _" 25. 0. .?SSS0 wS - 3 /� _ . ao 08 l 3 ) 2y This la <br /> volume change per°F(24) Digits per°F in test Volume change per digit test <br /> 'If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26. 30. HYDROSTATIC 31. 34. 38.NET v6LUME 39. <br /> LOG OF TEST PROCEDURES PRESSURE VOLUME MEASUREMENTS D1 TEMPERATURE COMPENSATION CHANGES ACCUMULATED <br /> CONTROL RECORD TO.MI GAL USE FACTOR(a) EACH READING CHANGE <br /> 27. 28. 29. Surelpip.L.rd 32. 35. 36. 37. T.mpaotun M Hidt bird ncere <br /> ORE Record details of fettjn u is Inches Product in Prodan Change Computation Adjustment Leal LM Ballades <br /> g P s.asaB Graduate Replaced 1-1 Thermal Nigher+ (c) a la)- soume Minus <br /> and tanning test.(Use full AN, BionninLwl to S...or Lords- od + Expansion 1 i o <br /> r a w Law.mee <br /> Oaf length Of line if needed.) afwa Akar hoden Reding (sl Connection- Cato -) clsPesHer <br /> I1/M.1 Reading Reading Rescreened a33(V)-0O7R1 <br /> IaFw meaul <br /> 661D ; 0E` A tis <br /> 0 6q�' 0-t 140ve ry x,0 IFvG.. N P.. eh <br />