Laserfiche WebLink
14. Ey.-I9 Co -_�7 ( / �o( U UAs4 - e sr 3 - la' - F7 <br /> Name of Supplier.Owner or Dealer Address No,and Sluet(U City Sul. Date of Test <br /> 15. TANK TO TEST 16. CAPACITY From <br /> Z [A Station Chart <br /> X vi By most accurate <br /> yd Tank Manufacwrer's Chert <br /> I N U P Q / Nominal Capacity capacity chart available- }U, �,a� <br /> A O Idantitr Dy position G.Ilens Gallons Company Engineering Data <br /> �� Is them doubt as to True Capacity 7 Charts supplied with �E3 <br /> IABrand and Grade See Section"DETERMINING TANK CAPACITY" Other <br /> 11. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to%In. 'Galloons� es.Reading <br /> SticWater Bott <br /> h oro Filupom - O - _ Inventory <br /> to 1k in. Gallons I g 3 <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank Diameter Ll Product In full tank(up to fill pipe) <br /> DoN p <br /> -f O O <br /> m 0 p O 16. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK 7 � VAPOR RECOVERY SYSTEM <br /> A1 0 <br /> i O O D Sea manual sections applicable.Check below and record procedure in log(26). art Stage I1/� <br /> O rix M_ Wafer In tank High water table in tank excavation e�s being tested 3 ith LVLLT Siege II /" <br /> Oy 00 � <br /> 0 <br /> m <br /> 0 21. TEMPERATUREIVOLUME FACTOR (a)TO TEST THIS TANK <br /> ro 19. TANK MEASUREMENTS FOR Is Todaywarmer? Calder? g <br /> 1 TSTT ASSEMBLY —°f Product in Tank—°F Fill-uD Product on Truck—°F Expected Chane( +or <br /> m Bottom of tank to Grade".................... 22. Thenal-Sensor reading after circulation 2 7 4 7 6 2- F <br /> Add 30"for 4"L --tt digits Nearest ° <br /> Add 24"or 3"L or air seal ....... 23. Digits per°F in range of expected change 22- <br /> digits <br /> Total tubing to assemble Approximate ..... a n " <br /> 20. EXTENSION HOSE SETTING 3 24. 6 S x ' 0 be 41 , 30 — . a S S�fS gallons <br /> Tank m m ... .. total quantity in coefficient of expansion for volume change In this hunk <br /> p grade•.. ......... full tank(16 or 17) involved product per°F <br /> Extend hose on suction tube 6"or more I' pps Q <br /> below tank top .................................... 4 Q 25. r sc C t 3 2 2 ve 0 0 0 7 9 / 8 This Is <br /> volume change per°F(24) Digits per°F in test Volume change par digit. test <br /> 'If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26. 30. Nrohosunc 31. 34. TIA <br /> UMS 39. <br /> LOG OF TEST PROCEDURES PRESSURE VOLUME MEASUREMENTS m IIYPEAAfUAE COMPENSATION ES ACCUMULATED <br /> CONTROL AECON 10.NI GL. USE FAP,lOA illi READING CNANGE <br /> 21. 26. 29. Sureties Leval 32. re M Nip Lase rensaYE Record details of settin u in Inch.. Product in Product 35. 36harge Cooperation at Taal Er k%CA p IN:as Graduate Replaced 1-) Therad Ni hs,+ caand runnin test. Use full Ne. A I I 1 1 inus Y�Ia.M c.rsaouU ( grew, Level to Sm.N LewM- Expansion+ +1 aiwE lenpih of line if needed.) of which BNou AHa holuet Robing Ic1 Cennadien- n 1-) INFiA vroerlilIN k.I R.ad.., Ruunit Reading Rural Reveymd(+) Doofchange por Near <br /> 37j) <br /> �7 d C �r UCA C p <br /> C jr k <br />