My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2115
>
2300 - Underground Storage Tank Program
>
PR0503956
>
REMOVAL REMOVAL 1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:42:37 PM
Creation date
11/7/2018 8:30:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 1990
RECORD_ID
PR0503956
PE
2381
FACILITY_ID
FA0006031
FACILITY_NAME
PACIFIC MOLASSES COMPANY
STREET_NUMBER
2115
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
2115 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WASHINGTON\2115\PR0503956\REMOVAL 1990 .PDF
QuestysFileName
REMOVAL 1990
QuestysRecordDate
10/17/2017 9:24:26 PM
QuestysRecordID
3686264
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J OAQUI N LOCAL HEALTH DISTRICT <br /> SAMPLING PROTOCAL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil <br /> samples collected shall be representative of native soils beneath the tank 's <br /> invert (tank 's bottom) at a collection depth not be exceed 2 - 4 feet. If contamination <br /> is documented during closure an Unauthorized Release notification must be filled out and <br /> submitted to SJLHD within 5 days. Section 2652, CCR. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons ONE per tank Fill or pump end of tank <br /> 1000 - 10,000 gallons TWO per tank One at each end of tank <br /> 10,001 gallons and up THREE OR MORE Ends and Middle or <br /> per tankgenerally spaced along <br /> the length of the tank <br /> Piping ONE EVERY 20 LINEAL FEET <br /> WATER IS PRESENT IN TANK PIT <br /> TANK SIZE MINIMUM NO. OF LOCATION OF SOIL MINIMUM NUMBER <br /> SOIL SAMPLES SAMPLES OF WATER SAMPLES <br /> 10,000 GALLONS From wall next to <br /> OR LESS tank ends at soil/ <br /> (Single Tank) TWOgroundwater ONE <br /> interface <br /> GREATER THAN From wall next to ONE <br /> 10,000 GALLONS tank ends at soil/ <br /> ORgroundwater <br /> TANK CLUSTER FOUR interface <br /> OTHER S PEC I AL CONE)I T I ONS <br /> SLAB PRESENT IN TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through <br /> the obstruction will be required in order to collect the samples. (Physical removal of the <br /> obstruction will then allow sampling according to the above conditions. ) <br /> TANK SIZE MINIMUM NUMBER OF ^LOCATION OF SOIL SAMPLES <br /> _ SOIL SAMPLES <br /> Less than 1000 gallons THREE per tank Center and ends or sides <br /> 1000 - 10,000 gallons FIVE per tank Center and ends or sides <br /> 10,001 gallons and up FIVE OR MORE per Ends and Middle and <br /> tank generallyy spaced along <br /> the lengEh of the tank <br /> EH 23 047 12/88 <br /> REVISED 1/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.