My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2300 - Underground Storage Tank Program
>
PR0231282
>
REMOVAL REMOVAL 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:13 PM
Creation date
11/7/2018 8:33:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 1998
RECORD_ID
PR0231282
PE
2381
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WASHINGTON\2201\PR0231282\REMOVAL 1998 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br />Project Location The Pott of Stockton, 2201 W. Washington St., Stockton, CA 95203 <br />Owner Same as above Phone No.,(( 209) 946-0246 - <br />Contractor JIM THORPE OIL.- INC. Phone No. (209)368--6175 License N0.495699 <br />INDICATE ME '11013 OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of vetification, e.., load ticket, within 30 days of project completion that one of the following materials <br />was placed In the excavation In 12" lifts: <br />A. Pea gravel --smooth, rounded material not more than one-half (1/r2) Inch in diameter <br />Crushed rock- -seff- cow pacting material not more than three-quarters (3/4) inch in cross sectional <br />measurenicni. (Use of <br />material and tanks/pipes srock will madeot be f polyrresindfor glassbor similar materialsbe made between <br />) <br />— B <br />DECLARATION <br />I hereby certify that a Soll Engineer's Compaction Report will be submitted within 30 days of project completion, or submission <br />of verificatlon that the select material described above will be placed at a minimum or five (5) cubic yards per 1000 gallon lank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br />Code Appendix Chapter 70. <br />• JIM THORPE OIL,INC. <br />Name (Print <br />• Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.