Laserfiche WebLink
BACKFILL EXCAVATION CERTIFICATE <br />PORT OF STOCKION <br />Project Location 209-946-0246 <br />PORT OF S'1'OCIL"IUN Phone No. <br />Owner <br />JIM THORPE OIL INC Phone No. 209-368-6175 License No. 495699 <br />Contractor <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />X1. Submission of Soil Engineer`s Compaction Report within 30 days of project completion, or <br />— 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12" lifts: <br />A. Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock–self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />–' measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br />backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />* BARRY Ii. NICHOLSON <br />ame (Print) <br />* 1NVIROIV'[t=AL SPECIALIST <br />it e t <br />icmature <br />* Shall be the responsible managing employee on the license or authorized agent, <br />