My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2300 - Underground Storage Tank Program
>
PR0232535
>
COMPLIANCE INFO PRE 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:41 PM
Creation date
11/7/2018 8:42:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2016
RECORD_ID
PR0232535
PE
2361
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
02
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WASHINGTON\2526\PR0232535\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
6/21/2016 6:09:05 PM
QuestysRecordID
3121830
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. Secondary container(s) thickness, density, composition, product compatibility. <br /> N/A Sized to contain unauthorized releases from primary containers to allow <br /> sufficient time for detection and removal. [Section 2631 (c)] <br /> 21. X Secondary container(s) volumetric requirements: [Section 2631 (e) (1) <br /> and (2)] <br /> A. Single primary containers = 100%. - <br /> B. Multiple primary containers = 150% of largest primary <br /> container or 10% above aggregate. <br /> 22. N/A Secondary container(s) open to rainfall. [ Section 2631 (f)] <br /> Volumetric requirements = 24 hours of 100 year storm in addition to <br /> primary container volumes. <br /> 23. N/A Secondary container floor. [Section 2631 (j)] <br /> A. Constructed on firm base. <br /> B. Sloped to collection sump ( 1/8 inch per foot). <br /> (1) One or more access casings installed in sump. <br /> (a) Size to allow removal of collected liquid. <br /> (b) Extended to ground surface. <br /> (c) Covered with a locked waterproof cap or <br /> within a secured facility. <br /> (d) Thickness allows for anticipated stresses. <br /> (e) Construction materials are not weakened <br /> stored product or will not donate, capture, <br /> or mask constituents to be monitored. <br /> 24. N/A Membrane liner specifications. [Section 2631; k,l, and m] <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.