My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2300 - Underground Storage Tank Program
>
PR0232535
>
COMPLIANCE INFO PRE 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:41 PM
Creation date
11/7/2018 8:42:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2016
RECORD_ID
PR0232535
PE
2361
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
02
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WASHINGTON\2526\PR0232535\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
6/21/2016 6:09:05 PM
QuestysRecordID
3121830
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~NEW UST INSTALLATION RECORD <br /> FACILITY NAME Cogeneration National Corp. <br /> FACILITY ADDRESS 2526 W. Washington Street Stockton CA 95203 <br /> swEEes e TANK# 7946 U.L. 0 J-351645 STI-P3 PRODUCT Waste Oil <br /> DATE APPROVED DISAPPROVED RENS ITEM OR EQUIPMENT INSPECTED <br /> V 1. UST INSTALLATION PLANS SUBMITTED &FEES PAID <br /> �� ql 1✓ 2. UST INSTALLATION PLANS APPROVED—pendin SuPes a.la(a� 4 <br /> INITIAL INSPECTION <br /> N A 9 1. HOLIDAY TEST CPLASTEEL) <br /> 2. AIR TESTED @ S PSI (FRP) <br /> 3. VISUAL INSPECTION OF 20 CONTAINMENT <br /> �7 QI°u 1''' 148 4. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL <br /> R— ln5lAllai-t n �� <br /> PIPING STAGE INSPECTION <br /> I,KfAl 1 1. PRESSURE TEST (10 AND 20 (NFPA 30)1 <br /> 2. BALL FLOAT VALVES INSTALLED <br /> OVERFIL,(. PROTE TON INSTr QESC E: <br /> 4. UNUSEDTANKOPENING SEALED & CATHODICALLY PROTECTED <br /> N s. VISUAL INSPECTION OF 20 CONTAINMENT ON PIPING <br /> n I J� 6. MONITORING PORTS IN PLACE & BROUGHT TO GRADE (LOCKABLE <br /> W p- WEATHER PROOF COVERS) <br /> !' 7. FILL &VENT PIPING BROUGHT TO GRADE <br /> 8. PRODUCT LINE LEAK DETECTOR INPLACE (HARD WIRED) <br /> Id 1 9. APPROVED UST LEAK MONITORING DEVICE INSTALLED �.Q K <br /> N 10.ALL GALVANIZED PIPING & FITTINGS PROPERLY WRAPPED <br /> �jFY 11. PRESSURE DECAY TEST ON COMPLETE UST & PRODUCT DELIVERY <br /> tl SYSTEM <br /> FINAL INSPECTION <br /> 1. PRECISION TEST SUCCESSFULLY COMPLETED AND HARD COPIES <br /> RECEIVED (NFPA 329) <br /> b q� 2. SPILL PROTECTION AT FILL PIPE <br /> �g(7i1 3. PERFORMANCE TEST OF OVERFILL PROTECTION SYSTEM <br /> . ,\ 4. PERFORMANCE 17�ST OF PRODUCT LINE LEAK DETECTOR (i-LORD <br /> N WIRED) D -..✓i-e� V10 r,Yr.cn,� <br /> S. PERFORMANCE�TEST OF ONTINUOUS MONITORING SYSTEM(S) ON <br /> kala' TANK(S) L-'�iU��. _ x <br /> 6. PERMIT TO OPERATE APPLICATION COMPLETE <br /> 7. ACCEPTABLE RECORD KEEPING SYSTEM <br /> Eri 23 b 4-23-91) <br />
The URL can be used to link to this page
Your browser does not support the video tag.