My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2358
>
2300 - Underground Storage Tank Program
>
PR0231756
>
COMPLIANCE INFO 2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 4:59:40 PM
Creation date
11/7/2018 9:03:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0231756
PE
2361
FACILITY_ID
FA0006343
FACILITY_NAME
ALPHA FAST GAS*
STREET_NUMBER
2358
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14118221
CURRENT_STATUS
01
SITE_LOCATION
2358 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\2358\PR0231756\COMPLIANCE INFO 2013 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2016
QuestysRecordDate
8/8/2018 4:42:56 PM
QuestysRecordID
3958640
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GOVE1, <br /> MAR 2 7 2015 <br /> SWRCB,January 2002 Pa,oe of <br /> 5. SECONDARY PIPE TESTING <br /> "fest Method Developed By: X Piping Manufacturer Industry Standard Professional Engineer <br /> Ci Other(Spec) <br /> "fest Method Used: X Pressure D Vacuum Hydrostatic <br /> LJ Other(Specify) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1;10-1 S Psi <br /> Piping Run# I Piping Run#2 Piping Run#3 Piping Run # <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 351 3" 3" <br /> Length of Piping Run: 100' 110' 75' <br /> Product Stored: Regular 87 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sume#2 Piping Sump#3 <br /> Wait time between applying 15 Minutes 15 Minutes 15 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:35 9:45 9:55 <br /> Initial Reading(Rj): 5 Psi 5 Psi 5 Psi <br /> Test End Time: 10:35 10:45 10:55 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-Rj): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments=- (include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.