My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2358
>
2300 - Underground Storage Tank Program
>
PR0231756
>
COMPLIANCE INFO 2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 4:59:40 PM
Creation date
11/7/2018 9:03:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0231756
PE
2361
FACILITY_ID
FA0006343
FACILITY_NAME
ALPHA FAST GAS*
STREET_NUMBER
2358
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14118221
CURRENT_STATUS
01
SITE_LOCATION
2358 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\2358\PR0231756\COMPLIANCE INFO 2013 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2016
QuestysRecordDate
8/8/2018 4:42:56 PM
QuestysRecordID
3958640
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 P"we —of� <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested \ "See comments below <br /> Test Method Developed By: Spill Bucket Manufacturer i Industry Standard ❑Professional Engineer <br /> 1 Other(Sped) <br /> Test Method Used: lJ Pressure Vacuum Ll Hydrostatic <br /> J Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End.Time- <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> PassfFail Threshold or <br /> Criteria: <br /> Test Result: <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Spill/Overfill Boxes tested annually with Monitoring System Certification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.