Laserfiche WebLink
LJ <br />0 <br />SWRCB, January 2002 L . � N o <br />9. UNDER -DISPENSER CONTAINMENT r11nC1 TF.aT1Nn V A�:�f <br />Test Method Developed By: 11UDC Manufacturer 11Industry Standazd X Profe��rTal �i&Q <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum Eft MI1 W.NTAL HEALT <br />. <br />❑ Other (Specify) 0EPARTKAENT <br />Test Equipment Used: Caldwell Level Change Indicator <br />UDC # 7&8 -CL UDC # 9&10 -CL <br />UDC Manufacturer: Bravo Bravo <br />Equipment Resolution: .002 <br />UDC # <br />UDC # <br />UDC Material: <br />Coated Steel <br />Coated Steel <br />UDC Depth: <br />9" <br />10" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />See Comments <br />See Comments <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />See Comments <br />See Comments <br />Condition of UDC prior to <br />testing: <br />Dry <br />Dry <br />Portion of UDC Tested <br />Water Level 7" <br />Water Level 8" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />roduct and water)? <br />ater)?� <br />No <br />No <br />Turbine shutdown response time <br />N/A <br />N/A <br />Is system programmed for fail- <br />safe shutdown? <br />yes <br />Yes <br />Was fail-safe verified to be <br />operational?* <br />No <br />No <br />Wait time between applying <br />water and starting test <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />10:25 <br />10:30 <br />Initial Reading R,): <br />.001 <br />.001 <br />Test End Time: <br />10:55 <br />11:00 <br />Final Reading (RF): <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />Change in Reading RF -R,: <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Pass <br />Was sensor removed for testing? <br />No <br />No <br />Was sensor properly replaced and <br />verified functional after testing? <br />N/A <br />N/A <br />— (include information on repairs made Prior to testin, and <br />All Penetrations enter from bottom of Bravo System UDC's, <br />CL=Card Lock Island. <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />