My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO 2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 4:34:37 PM
Creation date
11/7/2018 9:23:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\COMPLIANCE INFO 2011-2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07/1712012 18:38 : (209) 4854988 MaryAnn Henderson Page 3112 <br />Monitoring System Certification • • <br />A Results of Testing/Servicing <br />Software Version Installed: 329.01 <br />Com fete the following checklist: <br />® Yes <br />❑ No* <br />Is the audible alarm operational? <br />® Yes <br />❑ No* <br />Is the visual alarm operational? <br />® Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />® Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />❑ Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br />® N/A <br />operational? <br />® Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) C@ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? El Yes; ❑ No. <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br />® N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? % <br />❑ Yes* <br />® No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes* <br />® No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />® Yes <br />❑ No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />® Yes <br />❑ No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: Annular shared for Diesel and Premium tanks, <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.