My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 1:46:26 PM
Creation date
11/7/2018 9:23:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\COMPLIANCE INFO 2016-PRESENT .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing <br />Software Version Installed <br />Complete the following checklist: <br />® <br />Yes <br />❑ <br />No' <br />Is the audible alarm operational? <br />® <br />Yes <br />❑ <br />No' <br />Is the visual alarm operational? <br />® <br />Yes <br />❑ <br />No' <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />® <br />Yes <br />❑ <br />No' <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br />operation? <br />❑ <br />Yes <br />❑ <br />No' <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? <br />® <br />N/A <br />® <br />Yes <br />❑ <br />No' <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br />❑ <br />N/A <br />fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply) ® Sump/Trench <br />Sensors; ❑ Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ® Yes; ❑ No. <br />❑ <br />Yes <br />❑ <br />No' <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br />IR <br />N/A <br />installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent of tank capacity <br />does the alarm trigger? <br />❑ <br />Yes <br />® <br />No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br />and model for all replacement parts in Section E, below. <br />❑Yes' <br />® <br />No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product: ❑ Water. If yes, describe causes in Section E, below. <br />® <br />Yes <br />❑ <br />No' <br />Was monitoring system set-up reviewed to ensure proper settings? Attach setup reports, if applicable <br />® <br />Yes <br />❑ <br />No' <br />Is all monitoring equipment operational per manufacturers specifications? <br />In Section E below, describe how and when these deficiencies were or will be corrected. <br />REPLACED 91 LD THEN PASSED TEST. INSPECTOR ELIANA ON SITE WITH EH. HAD TO ADJUST <br />E. comments: FLOATS 7 91 AND 9 DSL THEN PASSED <br />Monitoring System Certification Page 2 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.