Laserfiche WebLink
Monitoring System Certification <br />UST Monitoring Site Plan <br />Site Address: ERNIE'S GENERAL STORE 4407 E. WATERLOO ROAD STOCKTON CA 95205 <br />KEY <br />......................... I...... A=ANNULAR <br />................................ F=FILLS <br />.............................. T=TURBINE <br />........................... P— PROBE <br />= <br />................................ VAPOR <br />X — SUMP SENSOR <br />. I .................... <br />— <br />. . . . . . . . . . <br />. <br />L=PLLD <br />M = Manway <br />. _ <br />B = Brine Sensor <br />I = Smart Sensor <br />. <br />S=SIT <br />. . . . . . . . . . . . . . . <br />. . . . . . <br />C = Floats & Chains <br />. <br />. . . . . . . . . . . . . <br />. <br />. . . . . <br />. . . <br />. . . . . . . . <br />. . . . . . . . . <br />n <br />. n . . <br />. . � . . <br />. . . . . . . . . . <br />. . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />v <br />T DOPOOT <br />P <br />3TD D GO <br />DSL. <br />. . . . . . . . . . V . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Date map was drawn: 1/22/18 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />