PIPING REMOVAL, SOIL TESTING PLAN Q
<br /> MATERIAL AND WORKMANSHIP 15. GOVERNING CODES AND STANDARDS INCLUDE, BUT SHALL NOT BE LIMITED D: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE �p
<br /> TO, THE STANDARDS OF THE FOLLOWING: 40, OR EXTRA STRONG. GALVANIZED PIPE 15 NOT ALLOWED. FITTINGS 1.0 GENERAL INFORMATION �° P
<br /> I. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL SHALL BE 300 PSI MALLEABLE IRON. 0
<br /> EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) LI LOCATION OF TANKS: ORLANDO'S :�) IV
<br /> COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE AMERICAN PETROLEUM INSTITUTE (API) E, ALL STEEL PIPE BELOW GRADE 15 TO BE DOUBLE WRAPPED WITH 20 5611 E. WATERLOO RD, c7 0P� 00
<br /> GRADE FOR THE PROCESS INTENDED. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) MIL. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL STOCKTON, CA
<br /> UNIFORM BUILDING CODE (UBC) TAPES, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP. (209) 931-2942o
<br /> O
<br /> 2. THE CONTRACTOR SHALL FURNISH TO THE OILNER'S AGENT FOR HIS NATIONAL ELECTRIC CODE (NEC) O Qp Q Q
<br /> APPROVAL THE NAME OF THE MANUFACTURER, THE MODEL NUMBER, AND NATIONAL FIRE PROTECTION AGENCY (NEPA) F: ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT 12 OLLNER: SAM 4 MARILYN ORLANDO
<br /> OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE UNDERWRITER'S LABORATORIES, INC. (UL) WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL 9125 OAKWILDE AVE. p�
<br /> PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY AND CALIFORNIA CODE OF REGULATIONS (CCR) COMPATIBILITY WITH THE PIPING MATERIAL USED, AND FOR USE WITH STOCKTON, CA 95212
<br /> ' MECHANICAL AND OTHER EQUIPMENT UA41CH THE CONTRACTOR CONTEMPLATES LOCAL ORDINANCES PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND 100% METHANOL, WHICH (510) 651-8500
<br /> INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S AGENT. SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET.
<br /> 3. WHEN REQUIRED BY THESE DOCUMENTS OR WHEN CALLED FOR BY THE 16 DURATIONSAFETY LOr THE CONTRACT
<br /> ASHALL SITE HEALTH 4 SAFETYLOP AND AINTAIN FOR THE PLAN THAT WILL G: G.G. SHALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL 1.3 PROJECTED PROJECT START- 01 OCT 96 �n � Q a p�
<br /> OWNER'S AGENT, THE CONTRACTOR SHALL FURNISH THE AGENT FOR EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS. 1.4 TANKS TO BE REMOVED: 3 STEEL: 1 • 8,000, 1 A 10,000, �nJ g Q �f
<br /> APPROVAL FULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES FOR TANK/LINE REMOVAL AND INSTALLATION, PRIOR WORK START, AND: 1 S 12,000 GALS. I�'�
<br /> 00
<br /> WHICH HE CONTEMPLATES INCORPORATING IN THE WORK WHEN 80 ffi. DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER Q
<br /> DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE A: APPOINT AND EMPLOYEE AS THE SAFETY OFFICER WHO 15 QUALIFIED TANKS SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS SHOWN ON 19 CONTRACTOR: WALTON ENGINEERING, INC O °
<br /> CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. AND AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE DRAWINGS. MINIMIZE GROSSING OTHER LINES AND CONDUIT. IF PIPING
<br /> HEALTH AND SAFETY PLAN, SUBMIT THE NAME AND QUALIFICATIONS OF 15 NOT SHOWN O SITE PLAN, G.C. SHALL RUN LINES THE M05T DIRECT GEOLOGIST: GRAYLAND ENVIRONMENTAL
<br /> 4, MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED THE SAFETY OFFICER TO THE OWNER'S AGENT PRIOR TO COMMENCING WORK ROUTE SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE. 2131 QUAIL ST. Q
<br /> WITHOUT REQUIRED APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT ON THE SITE. DAVIS, GA 95616
<br /> REJECTION. 14, PIPING SYSTEMS SHALL BE TESTED PER CURRENT MANUFACTURER'5 JEFF CLAYTON
<br /> B: THE PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE
<br /> 5. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND NUMBERS OF THE SUPERVISORY PERSONNEL, THE HOSPITAL FACILITIES PRECEDENCE OVER OTHER INSTRUCTIONS.
<br /> REGULATIONS. NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE
<br /> WRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS A: G.G. TO NOTIFY OWNER'S REPRESENTATIVE TWO WORKING DAYS PRIOR
<br /> 6, ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS OR HAZARDOUS SUBSTANCES BE UNCOVERED. TO LINE TESTING. OLLNER'S REPRESENTATIVE SHALL WITNE58 ALL LINE 2.0 CLOSURE PROCEDURE-REMOVAL OF TANKS
<br /> AND THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION TESTING. MARK TEST PRE65URES ON GAUGE WITH ELECTRICAL TAPE AT
<br /> OF THE OLNER'8 ENGINEER G. CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH EMPLOYEES BEGINNING OF TESTS. PRESSURE SHALL HOLD FOR AT LEAST ONE (U SAN JOAQUIN COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH TANK
<br /> AND SUPPLY THE MEETING MINUTES TO OWNER WHEN REQUESTED. HOUR AND BE WITNESSED BY OWNER'S REPRESENTATIVE. DO NOT BACKFILL CLOSURE GUIDELINES AND SOIL AND GROUNDWATER SAMPLING ORLANDO'S
<br /> 1. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR TRENCHES UNTIL AUTHORIZED BY OWNERS REPRESENTATIVE. GUIDELINES SHALL BE FOLLOWED, EXCEPT WHERE THE FOLLOWING
<br /> LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THIS D: IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP SPECIFICATIONS ARE MORE RESTRICTIVE.
<br /> PROJECT, IT 15 EXPECTED THAT THE M05T RESTRICTIVE CONDITION(S) OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE B: TEST PRESSURES SHALL BE: REMOVE ALL PRODUCT FROM TANKS. 5�o1I E. WATERLOO RD.
<br /> WOULD APPLY. CONDITION. IF THE CORRECTIVE ACTIO 15 INSUFFICIENT IN THE 2" 50 PSI AND APPLY SOAP SOLUTION.
<br /> OPINION OF THE OWINER'$ AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL 3" - 40 PSI AND APPLY SOAP SOLUTION. REMOVE ALL RESIDUAL LIQUID, SOLIDS, OR SLUDGES, 5TOCKTON, CA 95215
<br /> CORRECTIVE ACTION CAN BE IMPLEMENTED, 3 SECONDARY - 5 PSI AND APPLY SOAP SOLUTION. (20c3) 931-2942
<br /> GENERAL CONDITIONS PURGE VAPORS FROM TANKS WITH SOLID CARBO DIOXIDE (DRY ICE) AFN 081-100-52
<br /> E: PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHER'S WITH A MINIMUM G. CAUTION: DISCONNECT FLEX CONNECTOR FROM STP AND CAP PRIOR A MINIMUM OF 30 LBS. FOR GASOLINE AND 20 LBS. FOR DIESEL FOR EACH
<br /> I. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS OSHA TRAINING CLASS RATING OF 2-A,20-5:C WITHIN 50 FEET OF THE OPERATION. TO TESTING. APPLY d RELEASE PRESSURE SLOWLY. VENT/VAPOR SYSTEM 1,000 GALS. OF TANK CAPACITY AND PRESENT SALES SLIPS TO INSPECTOR ��---�
<br /> COURSE PRIOR TO THE START OF UJORK CERTIFICATION OF THIS MUST BE SHALL BE TESTED FROM TOP OF VENT, THROUGH MANIFOLD($), EXTRACTOR rl+` y
<br /> PROVIDED TO THE OU.NER'8 ENGINEER PRIOR TO THE START OF WORK 11. UNDERGROUND SERVICE ALERT (U.SA.) - THE CONTRACTOR SHALL NOTIFY BASE AND RISER, STAGE I CONTAINMENT MANHOLES, STAGE II VAPOR PELLETIZED DRY ICE IS RECOMMENDED. GAP ALL OPENINGS EXCEPT f
<br /> MEMBERS OF U.SA. 2 FULL WORKING DAYS IN ADVANCE OF PERFORMING LINES Td ISLANDS AND STAGE II FLEX CONNECTORS AT DISPENSER(S). `/ENT PIPE AND ALLOW TWO HOUR MINIMUM AND SIX HOUR MAXIMUM FOR )d
<br /> OXYGEN DISPLACEMENT AFTER PUTTING CARBON DIOXIDE INTO THE
<br /> 2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFACTURER'S ANY EXCAVATIO WORK BY CALLING THE TOLL-FREE ONE-GALL PROGRAM TANKS. VENT PIPE OPENING TO BE CHECKED WITH A COMBUSTIBLE GAS _ --�'
<br /> TRAINING REQUIREMENTS IN ACCORDANCE WITH 1994 CALIFORNIA UST NUMBER (800) 642-2444. D. SLOWLY PRE66URIZE PRODUCT LINES AND VENT/VAPOR SYSTEM TO 50 DETECTOR TO DETERMINE IF TANK IS VAPOR FREE OR IF ADDITIONAL
<br /> REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OWNER PSI. SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS AND FITTINGS, DRY ICE AND/OR TIME MAY BE REQUIRED.
<br /> CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHECKLIST CORRECT ANY LEAKS AND RETEST.
<br /> SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO PETROLEUM WORK SCOPE PLUG OR CAP ALL TANK OPENINGS LEAVING AN I/6" - 1/4" PRESSURE
<br /> OWNER E. SLOWLY RELIEVE PRESSURE FROM VAPORNENT SYSTEM AND REMOVE RELIEF HOLE IN ONE CAP AT THE TOP OF THE TANK ALTON
<br /> 1. PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WORK PLAN AND PLUG FROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE AN
<br /> 3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK SCHEDULE THAT ALLOWS THE SITE'S STORE TO REMAIN OPEN TO THE PRESSURE TO 5 PSI. MONITOR DAILY UNTIL ALL YARD PAVING IS VISUALLY INSPECT THE TANKS UPON REMOVAL. ALL EXTERNAL ?AHK lffw MWNGINEERING, INC.
<br /> MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH 1994 FULLEST EXTENT POSSIBLE. COMPLETE. SURFACES AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLES
<br /> we
<br /> CALIFORNIA UST REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OR LEAKAGE. THE RESULTS OF SUCH INSPECTION SHALL BE
<br /> OUANER CONTRACTOR SHALL COMPLETE THE TANK INSTALLATION CHECKLIST 2. FENCE OFF WORK AREA WITH 6' HIGH CHAIN LINK FENCE. POST "KEEP F. SECONDARY PIPE MUST BE PROPERLY CUT. INSPECT ALL PRIMARY DOCUMENTED IN WRITING, WITH PHOTOGRAPHS WHERE APPROPRIATE.
<br /> SUPPLIED TANK MANUFACTURER AND 5HALL FURNISH THE CHECKLIST TO OUT" SIGNS ON FENCE EVERY 30 FEET. AT THE END OF EACH WORK DAY PIPE SURFACES. PRE85URIZE SECONDARY PIPE TO 5 PSI AND SOAP ALL PATCH ANY HOLES WITH APPROVED MATERIAL BEFORE TRANSPORTING
<br /> OWNER. SECURE FENCING PANELS TOGETHER PIPE SURFACE AND FITTINGS. PRESSURE ON THE PIPING SECONDARY TANKS TO DISPOSAL SITE, P.O. EiOX 1025
<br /> SPACE SHALL BE MAINTAINED UNTIL AFTER THE PAVING IS IN PLACE OVER843 RISKE LANE
<br /> TWO SOIL SAMPLES SHALL BE ANALYZED FROM BENEATH THE 'TANK ONE
<br /> 4. CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES: 3. FLUSH, CUT, AND REMOVE PRODUCT LINES FROM EXISTING TANKS TO TANK FIELD AND PIPING RUNS, AND SHALL BE WITNESSED BY THE OILNER'S WEST SACRAMENTO, CA 85691
<br /> FROM DIRECTLY BENEATHTHE FILL PIPE. THE OTHER FROM A SIMILAR
<br /> DISPENSER ISLANDS. REPRESENTATIVE. (916) 312-1888
<br /> A. GENERAL ENGINEERING "A" POSITION MI THE OPPOSITE END OF THE TANK IF HER THAN STAINED FAX 313-1112
<br /> B. HAZARDOUS MATERIAL SUBSTANCE HANDLING ("HAZ") 4, REMOVE ALL EXISTING FUEL DISPENSERS, ISLANDS, BARRICADES, FUEL G. AFTER BEING WITNESSED BY OWNER'S REPRESENTATIVE, REMOVE LO CONTAMINATED AREA) EXIST IN LOCATIONS OCHER THAN THE ABOVE
<br /> LOCATIONS, THEN ADDITIONAL SOIL SAMPLES SHALL BE ANALYZED FROM
<br /> LINES, ASPHALT AND CONCRETE SURFACES AS REQUIRED, IN PRESSURE FROM PRODUCT LINES AND AIR FROM SECONDARY LINES AFTER THESE OBVIOUSLY STAINED OR CONTAMINATED AREAS. THESE DRAWW AND SPECIFICATIONS,AS
<br /> 5. CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL PREPARATION FOR INSTALLATION OF NEW AS SHOWN ON DRAWINGS. ANY FAVI - IS IN PLACE NSTRII�IENTS OF SERVILE,REnAM THE
<br /> HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER SALVAGEABLE EQUIPMENT TO BE REMOVED FROM SITE AS DIRECTED BY SOIL SAMPLES SHALL BE COLLECTED FROM THE NATIVE SOIL AT OR PROPERTY OF DALTON er.NEERM,NC
<br /> AS "ADDITIONAL INSURED". OWNER REPRESENTATIVE. 15, G. 8HAtL PERFORM PRECISION TEST ON PRODUCT LINE$ AFTER PAVING JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOIL. AND SHALL NOT M LtSED FOR ANY FURP069
<br /> 15 COMPLETE AND PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISION SAMPLES SHALL BE TAKEN USING A DRIVEN-TUBE TYPE SAMPLEROTHER THAN THOSE FORWwCHTWEYWAVE
<br /> BEEN SUPPLIED OR PREPARED.THESE DRAWWA
<br /> A. STATUTORY UKORKMAN'S COMPREHENSIVE LIABILITY 5. OU.N€R WILL CONTRACT WITH AND FURNISH CONSULTANTS TO PERFORM SOIL LINE TEST SHALL BE IN ACCORDANCE WITH NFPA 329, LOCAL CAPPED AND SEALED WITH INERT MATERIALS. FORMAL, SIGNED CHAIN- WAIL NOT BE REPRODUCED,COPIED OR TRACED
<br /> AND/OR WATER TESTING UPON PIPING REMOVAL IN ACCORDANCE WITH REQUIREMENTS, OR APPROVED EQUAL. TEST SHALL BE CONDUCTED BY A OF-CUSTODY RECORDS SHALL BE MAINTAINED FOR EACH SAMPLE AND MTHOUT THE EXPRESS ILRITTEN CONSENT OF
<br /> B. COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE PIPING REMOVAL PLAN AND LOCAL REGULATIONS. CERTIFIED TESTER G.C. SHALL PROVIDE WRITTEN REPORT OF PRECISION SUBMITTED WITH THE RESULTS TO THE REGULATING AGENCY. U&TON EW.INEER 5, SNC.
<br /> LIMIT OF NOT LESS THAN N,000,000 PER OCCURRENCE FOR BODILY TEST TO OWNER'S REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE of - COPYRIGHT © 1998
<br /> I INJURY AND PROPERTY DAMAGE. Co. CONTRACTOR SHALL PLACE EXCAVATED ALTERNATIVE SAMPLING ES METHOD MAY BE USED:'
<br /> SOIL ON, AND SHALL COVER WITH, _ PROJECT. EXPEDITE THE P HTANK REMOVAL, 1H€ FOLLOWING
<br /> 4 MIL. PLASTIC UNTIL SOIL 15 REMOVED, ANY 60IL TO BE STOCKPILED ON ALTERNATIVE
<br /> C. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED SITE FOR SAMPLING PRIOR TO OFF-HAUL BY OTHERS AS DIRECTED BY 16. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYNAMIC BACKPRESSURE q IMMEDIATELY UPON REMOVAL OF THE TANK, A BACKHOE BUCKET OF
<br /> VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY OWNER TEST OF ALL VAPOR RETURN LINES AS REQUIRED BY LOCAL REGULATIONS. NATIVE SOIL SHALL BE TAKEN FROM THE NATIVE SOIL TWO (2) FEET DRAWN BY TG
<br /> OF NOT LE58 THAN s1,000,000 PER OCCURRENCE FOR BODILY INJURY AND B£LOUJ THE 901L/BACKFILL INTERFACE. THIS SOIL SHALL BE RAPIDLY
<br /> PROPERTY DAMAGE. 1. OWNER SHALL PROVIDE FOR TRANSPORTATION AND DISPOSAL OF ALL 11. CONTRACTOR SHALL DO ANY OTHER TESTING AS REQUIRED BY LOCAL BROUGHT 70 THE SURFACE. CHKD' BY MEL
<br /> EXCAVATED SOIL AFTER COMPLETION OF ANY NECESSARY REMEDIATION, REGULATIONS.
<br /> 6. GENERAL CONTRACTOR TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND INCLUDING AERATION. B. APPROXIMATELY THREE INCHES SHALL BE RAPIDLY SCRAPED AWAY DATE 30 AUCs 96
<br /> SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE 18. CONSTRUCT NEW FUEL ISLANDS AS SHOWN ON DRAWINGS.
<br /> SATISFACTORY COMPLETION OF ALL WORK SHOLLN ON, CALLED FOR, OR 8. IF REQUIRED FOR ABANDONED EXCAVATIONS, BACKFILL OCE ALL SAMPLING FROM THE SURFACE OF THIS SOIL. THEN A GLEAN BRASS TUBE
<br /> REQUIRED BY THE DRAWINGS. AND/OR OVER-EXCAVATION 18 COMPLETED. BACKFILL MUST BE ENGINEERED 19SUITABLE INSTRUMENT (WOODEN MAL
<br /> . BRAVO BOXES, TURBINE SUMPS, AND OVERFILL BOXES ARE TO BE LEAST THREE INCHES LONG) SHALL L DRIVEN INTO THE SOIL WITH TH A SCALE NONE
<br /> LET, ETC.).
<br /> FILL COMPACTED TO e5%. THE CONTRACTOR 18 RESPONSIBLE FOR COMPLETELY SEALED AND WATER TESTED, AS EVIDENCED BY OWNER'S n
<br /> 1. ALL WOW SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM CERTIFYING THE COMPACTION. REPRESENTATIVE AS FOLLOWS: _ C. THE ENb8 OF BRASS TUBE SHALL BE COVERED WITH ALUMINUM FOIL, SOB NO. 26610
<br /> BUILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, -TI-IEN"P!ASTIC END CAPS, AND FINALLY WRAPPED WITH A SUITABLE
<br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, OSHA J. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW EQUIPMENT, 1. FILL WITH WATER TO HIGHEST PENETRATION. - TAPE.
<br /> CONSTRUCTION SAFETY ORDERS, AND ANY OTHER APPLICABLE STATE, CITY, 2. SPRAY PAINT TOP OF WATER REVISIONS
<br /> OR COUNTY ORDINANCES. 10, INSTALL "TYPAR" FILTER FABRIC LINER IN PIPING TRENCHES, PER - D. THE SAMPLE SHALL BE IMMEDIATELY PLACED O ICE, OR DRY ICE, _
<br /> DRAWINGS, WHERE REQUIRED BY WET-HOLE CONDITIONS. 20. PROVIDE AND INSTALL CONDUIT t WIRING FOR PETROLEUM SY$TEM(S) AND FOR TRANSPORT TO A LABORATORY. AGAIN, FORMAL CHAIN-OF-CUSTODY
<br /> 8. NOT USED CANOPY LIGHTING. PROVIDE CONDUIT FOR FUTURE CARDREADER5 AND RECORDS SHALL BE MAINTAINED AND SUBMITTED FOR EACH SAMPLE. DATE REV DESCRIPTION 13
<br /> 11. INSTALL EQUIPMENT AS LISTED IN EQUIPMENT LIST INCLUDING OTHER SITE ELECTRICAL AS INDICATED O THE DRAWINGS. IF THE BOTTOM OF THE TANK 15 BELOW THE GROUNDWATER TABLE, THEN
<br /> SALVAGEABLE EQUIPMENT TO BE REINSTALLED, IF ANY, AND PROVIDE AND SOIL SAMPLES ARE NOT REQUIRED. IN THIS CASE, A WATER SAMPLE
<br /> INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A COMPLETE 21. ALL CONDUIT IS TO BE 3/4" (MINIMUM) RIGID CONDUIT. SHALL BE COLLECTED AS SOON AS POSSIBLE FROM THE SURFACE OF
<br /> S. NOT USED PETROLEUM SYSTEM. THE GROUNDWATER IN THE EXCAVATION. A CHECK SHALL INITIALLY BE
<br /> 22. INSTALL MONITORING SYSTEM WITH INTERSTITIAL PROBES, TURBINE SUMP MADE FOR ANY FREE FLOATING PRODUCT. IF NO FLOATING PRODUCT 16
<br /> 12. PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR, AND SECONDARY PROBES, AND TANK GAUGES, AND MONITOR CONTROL PANEL IN BUILDING DETECTED, THEN A WATER SAMPLE SHALL BE TAKEN WITH A DEVICE
<br /> 10. GENERAL CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO CONTAINMENT LINES PER DRAWINGS. CURRENT MANUFACTURER'S PER DRAWINGS. DESIGNED REDUCE THE OF VOLATILE COMPONENTS. A BAILER
<br /> REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE 18 A SUITABLL E SAMPLING DEVICE. THE WATER SAMPLE SHALL
<br /> REPLACE TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS 23, INSTALL NEW DISPENSERS, AND CONTROL EQUIPMENT IMMEDIATELY POURED INTO A VOLATILE ORGANIC ANALYSIS (`!/OO
<br /> A) VIAL
<br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP 15 COMPLETED. AS INDICATED ON SITE PLAN AND DESCRIBED IN THE EQUIPMENT LIST. WITH AS LITTLE AGITATION AS POSSIBLE. A TEFLON SEPTUM SHALL BE
<br /> USED TO SEAL THIS VIAL.
<br /> OPERATIONS.
<br /> A: PRODUCT PIPING: 2" PRIMARY PIPING WITH 3" CONTAINMENT 24. NOT USED
<br /> 601E AND WATER SAMPLES SHALL BE ANALYZED FOR TOTAL
<br /> 11. ALL EXCAVATION$ SHALL BE PERFORMED IN COMPLIANCE WITH OSHA AND SYSTEM A$ APPROVED BY OWNER ALL PIPING AND CONTAINMENT SYSTEMS HYDROCARBONS BY THE METHODS OUTLINED IN "GUIDELINES FOR
<br /> STATE REGULATIONS. THE CONTRACTOR IS REFERRED TO THE OSHA SHALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT SYSTEM SHALL 25, INSTALL NEW CONCRETE TANK AND DRIVE $LABS AND OTHER CONCRETE AS ADDRESSING FUEL LEAKS. CALIFORNIA REGIONAL WATER QUALITY
<br /> BOOKLET, "EXCAVATING AND TRENCHING OPERATIONS", FOR A SAFE WORK BE BY THE SAME MANUFACTURER, WITH THE SAME SERIES ADHESIVES INDICATED ON SITE PLAN. CONCRETE SHALL HAVE A MINIMUM CONTROL BOARD, SAN FRANCISCO MAY REGIO - SEPTEMBER 1989."
<br /> PRACTICES GUIDE FOR PERFORMING EXCAVATIO WORK. AND/OR FITTINGS. COMPRESSIVE STRENGTH AT 28 DAYS OF 2500 PSI.
<br /> LOAD TANKS ON HIGHWAY CARRIER WITH PRESSURE RELIEF HOLE UPON SWEET 71t�E
<br /> 12. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH B: VENT/VAPOR PIPING: RED THREAD IIA AND RED THREAD 11 WITH 26. REPAIR AND/OR REPLACE A.C. PAVING AND BASE TO MATCH ORIGINAL IN SAME DAY AS REMOVAL. UNLESS THE TANKS HAVE BEEN TRIPLE RINSED,
<br /> "AS BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS BUILTW FITTING$ AND 1000 AND 8000 SERIES ADHESIVE, OR AMERON DUALOY AREAS DISTURBED BY WORK. THE CARRIER MUST BE A LICENSED WASTE HAULER AND MANIFESTS
<br /> SHALL BE COMPLETED ON-SITE WITH INFORMATION NOTED DIRECTLY O 30001- WITH ALCOHOL FITTINGS AND RP48 ADHESIVE. DO NOT MIX 21. ,ANY ENVIRONMENTAL WORK REQUIRED OUTSIDE THE ABOVE SCOPE OF WORK MUST ACCOMPANY THE TANKS.
<br /> APPROVED JOB COPY. MANUFACTURER'S MATERIALS. `1-7 E N . NOTE S
<br /> SHALL BE DONE ON A TIME AND MATERIALS BASIS. RENTAL RECEIPTS, 3D REMOVAL OF PIPING
<br /> 13. NOT USED C: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN SUBCONTRACTOR INVOICES, MATERIAL RECEIPTS, AND DAILY LABOR TIME SCOPE O R
<br /> TRAINED BY MANUFACTURER SHEETS SHALL BE REQUIRED TO SUPPORT GENERAL CONTRACTOR TIME AND PIPING TO BE REMOVED SHALL BE EMPTIED OF ALL CONTENTS PRIOR TO
<br /> MATERIAL INVOICES. SUCH WORK SHALL BE BILLED SEPARATELY. REMOVAL. PIPING -SHALL BE STOCKPILED ON-81TE PRIOR TO DISPOSAL. C L O S U R E
<br /> 14. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS.
<br /> VISUALLY INSPECT PIPE TRENCH FOR INDICATION OF LEAKAGE. A 601E
<br /> SAMPLE SHALL BE TAKEN AND ANALYZED FOR EACH TWENTY LINEAL
<br /> FEET OF TRENCH IF INSPECTION OF TRENCH REVEALS EVIDENCE OF
<br /> LEAKAGE. FOLLOW PROCEDURE LISTED IN SECTION 2.1 FOR SAMPLING
<br /> AND ANALYSIS.
<br /> PET - 5
<br /> OF 6 S EETS