Laserfiche WebLink
7 P '7KFILL EXCAVATION CEnRTIFICATE/ <br /> Project Location r 2_7 <br /> Owner Z-,o e L C-/ —S 10 /f,o 0 Phone No. <br /> -- i <br /> Contractor cJ�jrn //7�Ulje Q/L/�C Phone No. 20 qS�/ License No. <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12' lifts: <br /> C�_,><A. Pea gravel—smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tatilt <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> ame tm <br /> -y u e nye �— <br /> * <br /> signature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />