Laserfiche WebLink
Ua ors Totter <br /> �41�1� PI tQ1 <br /> p� Total Or anic PI�1 of ��gakic <br /> detection l <br /> hotoionization the concerftrat1° least once <br /> A direct reading�Pl be used to monitor will be taken a <br /> or equivalent) ark area. Measurements le collection. <br /> in the surface and subsurface sample <br /> vapor <br /> vapors during Total Organic of <br /> every 15 minutes for benzene. }ro�riate levelsk,otal <br /> The meter will be calibrated <br /> used to determine the apt � <br /> Will be onditions for site evacuatzone in excess <br /> measurements '� level D to <br /> iratory Protection► and c in the workers p breathing el <br /> resp or concentrations trigger an upgrade of 250 <br /> organic vapor round will oncentrations ir} excess <br /> Of 10 Om above backg zone c <br /> Breathing the wont zone concentrations are <br /> level 'G protect�jel�work on-site until <br /> ppm will <br /> stop <br /> reduced to below 250 PPm- <br /> EMPLOYEE TRAINING AND INFORMATION <br /> Have completed the cert it 1�de40g ur lowi �g}ob,jectidves� <br /> All Personnel working and have been tralned <br /> waste training course, <br /> Workers are aware of potential hazards they <br /> 4 <br /> may encounter. <br /> Knowledge and skills necessary to perform the <br /> 0 <br /> isk to works health and safety <br /> work with minimal r . <br /> lte Safety plan and <br /> o Familiarization with <br /> th <br /> site-specific requirements <br /> The training plan for this site encompasses. <br /> o Potential physical and chemical health hazards. <br /> o Respiratory protection, rationale, use, uaintenatice <br /> and fit testing. <br /> o Protective clothing, use and maintenance. <br /> o Entry, exit and decontamination Procedure, <br /> o Documentation and record keeping procedure, <br /> 4 <br />