Laserfiche WebLink
• <br /> 180 E. Weber, Stockton CO0070111 <br /> On July 28, 2014, additional excavation was conducted in an attempt to remove the source <br /> contamination as much as possible while the construction pit was still open. Bottom of the over- <br /> excavation was about 26 feet bsg, removing soil and groundwater significantly stronger(odor <br /> and discoloration) than previously encountered at around 15 feet bsg. Groundwater came in at <br /> about 21 feet bsg. Five soil samples have been collected for lab analyses. Soil pile is being <br /> staged on site waiting for removal pending on profiling/lab analyses. Results of the lab samples <br /> have not been released. <br /> Environmental Health Contact: Jeffrey Wong <br /> Senior REHS <br /> (209) 468-0335 <br /> jwong@sjcehd.com <br /> Attached: Official Inspection Report, map, and photos dated July 28, 2014 <br /> Lab results of samples from July 18, 2014 <br /> )��vV <br /> Jeff Wong, REHS <br /> Senior Registered Environmental Health Specialist <br /> Email copy: Leona.Winner@dtsc ca Roy <br /> steven.meeks@waterboards.ca.gov <br /> 2 <br />