"IE,E,Rreber Street July 21,2014 180 E.Weber Street July 21,2014
<br /> Stockton,California Project No.402132005 Stockton,California Project No.402132005
<br /> I. INTRODUCTION 3- SCOPE OF WORK
<br /> Ninvo&Moore will be observing the removal of one approximate 1,500 gallon underground The,UST removal will be performed by Safety-Klcen,who is not a Ninvo&h1oone subcontrac-
<br /> storage tank suspectod to contain diesel fuel or home heating oil that was discovered during the tor,Nmyo&Moore will observe the UST removal activities to ensure they comply with the
<br /> corstruetion activities being performed at 33 Hunters Square,Stockton,California.In addition, SJCEHD UST removal permitting requirements.Sa&ty-Klcen will be responsible to remove all
<br /> Ninyv&Moore will observe the excavation of petroleum hydrocarbon impacted soil and collect residual liquid contents from the UST and men the UST's internal atmosphere to conditions that
<br /> sail confirmation samples.The site is proposed for development and construction of the new do not present an explosive concern.Following the removal of die UST,Maya&Moore will
<br /> Stockton Courthouse.The objectivc of the this work is to:l)ensure the UST is being removed to direct the excavation contractor to collect soil from the bottom of the UST excavation area so
<br /> comply with the conditions of the UST Closure Permit issued by the San Joaquin County Envi- that a sample can be collected from the excavator bucket.Ninvo&Moore will collect the sample
<br /> renmemal Health Jkpartment(SJCEHO);area 2)assist the client with identifying the nature and following standard environmental handling procedures and submit die sample to TestAmerica
<br /> extent of thc soil contamination,and characterization of the excavated soil for waste disposal. Laboratories. Should the sample indicate elevated petroleum hydrocarbon concentrations,
<br /> Ninvo&Moore hill direct the contractor to excavate the soil below the former UST)oration,
<br /> LI. purpose of Plan followed by the collection of another round of soil samples.No groundwater sampling is anto,i-
<br /> This Health and Safety Plan(HASP)was prepared by Nmyv&Moore and is written spc- pated forthis work.
<br /> ciEcally for Ninyv&Moore personnel,as well as Ninvo&Moore subcontractors,to be
<br /> An oma of petroleum hydrocarbon impacted soil will be excavated by the site's contractor
<br /> used during the UST removal activities.This HASP describes the work to be purfomhcd and
<br /> Ninvo&Moore will observe this excavation work in order 90 visually identify the hosimntal and.
<br /> addresses health and safety concerns with respect to the planned tasks,as well as personal
<br /> protection requirements and safe working practices,monitoring and else central procedure. vertical extents ofthe contaminated soil.The excavated arca will be sloped and no personnel will
<br /> and contingency plans for emergency situations. enter into the excavation.Upon minoring all visually impacted soil,Maya&Moore will direct
<br /> the excavation contractorto collect soil from the four sidcwalls and bottom of the excavated arca
<br /> This HASP was prepared for Ninvo&Moore personnel use while performing the following (five soil sarnples total).Ninvo&Moore will collect the samples following standard environ-
<br /> Wksmcnial handling procedmi; and submit the sample to TestAmerica laboratories, No
<br /> • Task I.Observe removal of UST and collect soil sample; groundwater sampling is anticipated for this work.
<br /> • Task 2:Observe excavation of contaminated sail,and collect soil confirmation samples
<br /> and soil stockpile samples, All excavated soil will be placed on and covered with plastic shooting.Ninvo&Moore will co-
<br /> L SITE BACKGROUND Iect one four-point composite sample From each soil stockpile for waste chamctcrization.The
<br /> stockpile samples mvilI be collected from approximately six-inches bclow the stockpile surface
<br /> This project involves obscn�ing the UST removal and collection soil sanhplcs.This work will m-
<br /> using disposable sampling equipment.The soil samples will be handled in the same manner as
<br /> cluck the use of soil sampling equipment.The UST removal and soil excavation activities will
<br /> mquirc the use of heavy cquipmcnt,including backlhoes antler excavators. previously deseribed.
<br /> Personnel that will manage as well as conduct the field work on this project,including subcon-
<br /> tractors,am identified in Table 1 along with their contact information..
<br /> 180 E.\Veber Streetlul y 21,2014 180 E.Weber Street July 21,2014
<br /> Stockton,California Project No.402132005 Stockton,California Pmject No.402132005
<br /> Table 1-Project Personnel&Subcontractors protection(ear plugs or muffs)to reduce their exposure to excessive noise.Persons who
<br /> Title Name Daytime Arrar Hours enter meas in excess of 85 decibels(dB)will be required to wear bearing protection.
<br /> Pmj-h Manager Jason Came (51u)343.3(XJU (510)713-9653 Subcontractor personnel will implement equivalent effective hearing conservation pro-
<br /> x15202
<br /> Field Teem Leader/Site Health fi grams in accordance with Program requirements.
<br /> Safcm0(fucsfSH50
<br /> Melissa Tom (510)455-1087 f51tJ)455-1087 q
<br /> Ninvo&.Moore Cmp me Sarcty 51nu Weide ("X8 576-1060 (8581349-RG19 4,1,3, Vehicle and Heavy t
<br /> and Health Manager sl28s vy E quipmen Operation
<br /> Analytical tabommn Suhcomrac- TeslAacrira Lah—w- Vehicles will only be operated in authorized areas.When moving cquipmcnt,caution is
<br /> Lor ries (925)484-1919 1 (925)484-1919
<br /> to be exercised in order not to damage equipment or cause injury_When backing up
<br /> 1CC-AOC I'rcicn Mom•cr Pdi Desai rh (319)55&3117 (8181416-1636
<br /> heavy vehicles(larger than pickup trucks),passenger vehicles,or pickups with obsoued
<br /> 4. HAZARD ANALYSIS mar vision,a guide will be used to direct the vehicle Personnel directing traffic will
<br /> wear orange vests Each vehicle will be equipped with a minimum of one fire estfn-
<br /> 4.1. Physical Hazards guishermoed 3A:40B:40C,
<br /> The physical hazards associated with Nirry e&Moore projects may include vehicle traffic;
<br /> noise;energized and hydraulic her mcreig equipment;,heavy cquipmcnt storm-cleaning 4.L4, Falling,Slipping,and Tripping
<br /> cquipmcnt Falling,slipping,and tripping;manual Iiftmg;and generalphysical hazards. Work zone surfaces will be maintained in a neat and ordcriy state,Unnecessary foot
<br /> Tlscse physical hazards aro discussed in the following secvans_ traffic are to be avoided in areas where materials arse stored on the ground.Tools and
<br /> materials are not to be Icfl randomly on surf ecs when not in direct use.The drilling
<br /> 4,1,1. Vehicle Traffic crew superiscr will assure that the work area around each drilling operation is main-
<br /> The work she should have no traffic into the work area The amas whom die UST n;- tainod in a neat and orderly stale.Haws and cables will be grouped,.routed to minimize
<br /> moval will be coned off.and no cars should be parking adjaccnl to die work areas, hazards,and covered with a romp or bridge or clearly narked with haaard tape ar flags
<br /> Caution should be taken in staying witvn delineated work areas.no appropriate sign- ifsuch material will remain in place formom than one shift,
<br /> age and lighting will be used in blocking out the work areas,
<br /> 4,15. Manual Lifting Techniques
<br /> 4A.2. Noise During any manual material-handling tasks,personnel will be trained to lift with the
<br /> Working near heavy equipment Dat might be used on the site can subject workers to force of the load suspended on their legs and not on their backs.An adequate number of
<br /> ncew exposures in excess of allowable limits.Nonessential personnel who do not nerd personnel or an appropriate mechanical device must be used to saFciv lilt or handle
<br /> to be near loud equipment will be directed to keep as much distance from the equipment heavy equipment.When heavy objects must be lifted manually;workers will keep the
<br /> as possible while it is operating to lower the risk of noise-induced hearing loss.Person- lead close to the body and will avoid any twisting or turning motions to minimize stress
<br /> nel who operate or must work adjacent to drill rigs will be required to wear hearing on the lower back.The SHSO can provide a lifting orientation and specific back stmch-
<br /> ing and warm-up chemises to help minimize the potential For back injuries.Use ofthcse
<br /> •r, ,.. a rylnya.Maat a
<br /> 4 "yo,Moore
<br />
|