Laserfiche WebLink
aOAAO Of 11tUi1EES SAN JOAQUIN LOCAL HEALTH DISTRICT SERVING <br /> I•�a cdpanaon, Pru. I <br /> 1.111cle E. Vonnuccl, SK'y. City of Lod, <br /> knlhona/la Van Spron,an 1601 East Hazalton Avenue. P. O. Bolt 2009 San Joaquin County <br /> E•rl P,mantatCity of Elcdon <br /> Stockton, Calllornla 95201 <br /> un Buphaa City of Manteca <br />)an,al L. Flora. 209/466-6781 City of Ripon <br /> john 0. Maal, M.O. City of Stockton <br /> villain J. WadaGly of Tracy <br /> Joel Khanna, M,O., M.P.H., Olalrlct Naallh 011lCw San Joaquin County <br /> A ary Anna low San Joaquin County <br /> facility Name RQ�vr�� l�la �5 <br /> Address <br /> Date of inspection Inspector / r t� e Q -rf t <br /> MONITORING ALTERNATIVE d7 <br /> Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br /> where the liquic: level in the tank can be measured to an accuracy of +S gallons or less <br /> when the tank is half full . <br /> This mon 'toring alternative shall include: <br /> : Annual precision test on tank and piping. <br /> t/ Tank gauging performed as follows: <br /> 1/gaTank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours). <br /> (For example : level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> [ f liquid level varies more than 1 % of the tank volume or S gallons , which <br /> ever is less , between measurements , an unauthorized release shall be <br /> assumed to have occurred and Shall be reported to the local agency within <br /> 24 hours , as per Article S, Sect . 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations . <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified . <br /> Precision test(s ) YR81 results submitted to Chis <br /> office within JO days _ --- -- — <br /> lank gauging must be started inanediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact Ulls office prior to the specified <br /> date <br /> 4/86 UGT 3 <br />