Laserfiche WebLink
1—Od-222 8:29AM FROM SACRAMENTO EMC 9169252816 P. 7 <br /> 0 0 <br /> Sacramento Equipment Maintenance Company, Jnc Work Order# 106605 <br /> Site Address: PGE094 -Stockton Service Center Date of Testing/Servicing: 11/01101 <br /> 4040 West Lane-Stockton <br /> D. Results of Testing/Servicing: <br /> Software Version Installed. not available <br /> Yes \c, NIA Complete the following checklist: <br /> Is the audible alarm operational? <br /> ✓ is the visual alarm operational? <br /> ✓ Were all sensors visually inspected,functionally tested, and firmed operational? <br /> ✓ Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ✓ If alarms are relayed to a remote monitoring station,is all communications equipment(e.g. modem) <br /> operational? <br /> For pressurized piping systems, does the turbine automatically shut down if the piping socondary containment <br /> monitoring system,detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shutdown? (Check all that apply) <br /> .i Sump/Trench: ,/ Dispenser Containment Sensors <br /> Did you confirm positive shutdown due to leaks and sensor faiiure/disconnection? JYcs No <br /> ✓ <br /> For tanks systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no <br /> mechanical overfill prevention valve is insta�lIed), is the overfill warning alarin visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm triggers % <br /> .� Was any monitoring equipment replaced? If yes,identifyspecific sensors,probes or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E below. <br /> ✓ Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> Product ✓ Water If yes, describe causes in Section E below. <br /> ?i ✓ Was monitoring system set-up reviewed to ensure proper settings? <br /> ✓ Is all monitoring equipment operational per manufacturer's specifications? <br /> (Aoove slladec# u.cs need k #taw;andvlterr these sleclerrcies ar ill bec®rteted uteC,tion E 1elow) <br /> E. Comments, <br /> 03/01 Page 2 of <br />