Laserfiche WebLink
• Pacific Gas and Electric Comnany JAN 0 8 2004 <br /> Corporate Rea! Estate Department <br /> Gary Pforr ENVIRONMENT HEAIJ11 <br /> 1030 Detroit Avenue, Concord, CA 94518 PER MATISERVICES <br /> Office: 925-674-6707 Fax: 925-674-6565 <br /> Cell: 925-586-7901 Pager: 925-509-5023 <br /> Email: gjp5@pge.com <br /> Tuesday, January 06, 2004 <br /> San Joaquin County Environmental Health Department <br /> 304 East Weber Street, Third Floor <br /> Stockton, CA 95202 <br /> Telephone (209) 468-9847 FAX (209) 468-3433 <br /> Attn: Michelle Le, Senior Registered Environmental Health Specialist <br /> Re: 2003 Work to Upgrade Existing Unleaded, Diesel, and Waste Oil UST's <br /> at PG&E's Stockton Service Center, 4040 West Lane, Stockton, CA 95201 <br /> Location: <br /> The following information is being furnished in response to your letter of December 2"d, 2003 <br /> addressed to Jim Jarvis, PG&E's environmental field specialist for the Stockton area: <br /> 1. Annual Line Leak Detector Results: The diesel and the unleaded pressurized piping system <br /> each use a Veeder-Root electronic pressure line leak detector as a component of the TLS-350 <br /> monitoring system. The Scott Company of California tested both detectors on June 26, 2003 <br /> during annual re-certification of the monitoring system. Please refer to the enclosed results. <br /> The line leak detector test results are shown under paragraph G. on page 3 of the report. <br /> 2. Permit to Repair/Replace Failed Equipment: Through conversations with you, Kent Miller of City <br /> of Stockton Fire Department, and with Robert Corsun of Paradiso Mechanical, Inc., I confirmed <br /> that proper permits were secured to complete the repair and upgrade work. At this time I'm <br /> awaiting copies of the completed permits from our contractor. <br /> 3. Post-Construction Line Tightness Test for Waste Oil Tank: Per the enclosed memo from Tank <br /> Tek, the gravity flow waste oil product line was isolated and tested as part of the tank. This test <br /> is highlighted on Tank Tek's test report sheet dated November 15, 2003 (enclosed). <br /> Please call me if you have any questions. <br /> Since ly, <br /> TQK <br /> Gary Pf rr <br /> Project Manager, Building Design and Project Services <br /> PG&E Corporate Real Estate Department <br /> Enclosures <br /> Monitoring System Re-certification Report by Scott Company dated 6/26/03. <br /> Tank and Piping Integrity Test Report by Tank Tek dated 11/15103. <br /> Memo from Tank Tek dated 11/15/03. <br /> Cc - Jim Jarvis, PG&E <br />