My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:18:57 PM
Creation date
11/7/2018 10:14:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\BILLING 1985 - 2000.PDF
QuestysFileName
BILLING 1985 - 2000
QuestysRecordDate
8/2/2018 6:44:07 PM
QuestysRecordID
3953384
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNI WATER RESOURCES CONTROARD y f <br /> FORM ' '. NK': UNDER ROUND STORAGE TAPRO AM �v <br /> TANK PERMIT APPLICATION INFORMATION <br /> TANK COMPLETE A SEPARATE FORM WITH THE FOLLOWING INFORMATION FOR EACH TANK. t Z <br /> t� <br /> MARK ONLY F-] 1 NEW PERMIT F-] 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED TANK <br /> ONE ITEM El2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE B TANK REMOVED To <br /> FACILITY/SITE NAME WHERE TANK IS INSTALLED; 440 a�1 .1�rZ <br /> FARM TANK-YES❑, NO W <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-IF UNKNOWN-SO SPECIFY <br /> A. OWNERS TANK ID# B. MANUFACTURED BY: 4t Cn <br /> C. YEAR INSTALLED D. TANK CAPACITY IN GALLONS_____4 : <br /> II. TANK CONTENTS IF(A.1),IS MARKED,COMPLETE ITEM C.IF(A.1),IS NOT MARKED,COMPLETE ITEM D. <br /> A, ❑ 1 MOTOR VEHICLE FUEL ❑ 2 PETROLEUM B. C. ❑ 1 UNLEADED ❑ 2 LEADED ❑ 3 DIESEL <br /> 3 CHEMICAL PRODUCT OIL ❑ 1 PRODUCT ❑ 4 GASAHOL ❑ 5 JET FUEL ❑ 6 AVIATION GAS <br /> ❑ 5 HAZARDOUS ❑ 8D EMPTY ❑ 95 UNKNOWN WASTE ❑ 7 METHANOL OTHER(DESCRIBE IN ITEM D,BELOW) <br /> D. IF NOT MOTOR VEHICLE FUEL,ENTER NAME OF / C'A.S.# CJ/S 15 <br /> HAZARDOUS SUBSTANCE STORED&C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOX A,B,C,&D <br /> A.TYPE OF ❑ 1 DOUBLE WALLED ❑ 3 SINGLE WALLED WITH EXTERIOR LINER 95 UNKNOWN <br /> SYSTEM �2 SINGLE WALLED ❑4 SECONDARY CONTAINMENT ❑ 99 OTHER <br /> 1 STEELIIAON ❑ 2 STAINLESS STEEL ❑ 3 F18ERGLASS ❑4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B.TANK ❑ 5 CONCRETE ❑ 6 POLYVINYLCHLORIDE ❑ 7 ALUMINUM 8 100%METHANOL COMPATIBLE FRP <br /> MATERIAL <br /> ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑99 OTHER <br /> F-] 1 RUBBER LINED El ALKYD LINING F-] 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C. INTERIOR <br /> LINING F-] 5 GLASS LINING ❑6 UNLINED U-eUNKNOWN <br /> ❑ IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? ❑YES ❑ NO ❑ 99 OTHER <br /> D.CORROSION ❑ 1 POLYETHLENEWRAP ❑ 2 TAR OR ASPHALT ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE � UNKNOWN ❑ 99 OTHER, <br /> IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND, U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A JU 3 GRAVITY A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALLED A U 2 DOUBLE WALLED A U 3 LINED TRENCH A U 91 NONE A dD;5 UNKNOWN A U 99 OTHER <br /> A U 1 STEEL/IRON A V 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC) A U 4 FIBERGLASS PIPE A U 91 NONE <br /> C. MATERIAL A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL CLAD W/FRP A U 8 100%METHANOL COMPATIBLE FRP <br /> A U 9 GALVANIZED STEEL A f U 195 UNKNOWN A U 99 OTHER <br /> V. LEAK DETECTION SYSTEM CIRCLE P FOR PRIMARY,OR S FOR SECONDARY,A PRIMARY LEAK DETECTION SYSTEM MUST BE CIRCLED. <br /> P S 1-VISUAL CHECK P 5 2INVENTpRY RECONCILIATION P S 3 VADOSE WELLS P S 4 ELECTRONIC MONITOR P 5 5 GROUND WATER MONITORING WELLS <br /> P S 6 PRECISION TESTING P S 7 PRESSURE TESTING P S 91 NONE P S 95 UNKNOWN P S 99 OTHER <br /> VI. INFORMATION ON TANK PERMANENTLY CLOSED IN PLACE <br /> I. ESTIMATED DATE LAST USED(MO/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK..F3LLED WITH <br /> GALLONS SUBSTANCE REMAINING IN INERT MATERIAL? YES [:] NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT. <br /> APPLICANT'S NAME(PRINTED&SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY <br /> COUNTY# JURISDICTION# AGENCY# FACILITY ID# TANK ID# <br /> Ll <br /> CURRENT L CAL AGENCY FACILITY ID# APPROVED BY NAME } PHONE WITH AREA CODE <br /> G/ -1c 5A D'7 8.5 l� <br /> PERMIT NUMBER PERMIT APPROVAL RAT PERMIT EXPIRATION DATE <br /> CHECK# PERMIT AMOUNT SURCHARGE AMT. FEE CODE RECEIPT It BY: <br /> 'RMB(6-29-6B) THIS FORM MUST BE ACCOMPANIEMY A FACILITY/SITE APPLICATION, FORM `A',UNLESS WRENT FORM'A' HAS BEEN FILED <br /> DATA PROCESSING COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.