My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:18:57 PM
Creation date
11/7/2018 10:14:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\BILLING 1985 - 2000.PDF
QuestysFileName
BILLING 1985 - 2000
QuestysRecordDate
8/2/2018 6:44:07 PM
QuestysRecordID
3953384
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA a <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑�/7p PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE L-I ' TANK REMOVED Q <br /> DBAOR FACILITY NAME WHERE TANK IS INSTALLED: xh90 Sf' <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.# B. MANUFACTURED BY: aj <br /> C. DATE INSTALLED(MO/DAY/YEAR) D. TANK CAPACITY IN GALLONS: .2^0000 <br /> 10 <br /> II.TANKCCITENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. aUNL ULARAD ❑ 3 DIESEL L g AVIATIONGAS <br /> F72 PETROLEUM ❑ 80 EMPTY �RODUCT ❑ lb PREMIUM J <br /> ❑ 4 ETFUE ❑ 7 METHANOL <br /> UNLEADED ❑ 5 ETFUEL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE E] 2 LEADED ❑ gg OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.ANO C,AND ALL THAT APPLIES IN BOX 1) <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> 1 <br /> B. TANK BARE STEEL F72 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE F-1 7 ALUMINUM S 100% METHANOL COMPATIBLE W/FRP <br /> (PrlmaryTank( 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN ❑ <br /> LINING 88 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION ALU 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELW/COATING A U g 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A 9S UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 MON00RING ❑99 OTHER <br /> V.TANK LEAK DETECTION <br /> �j/ ❑ 1 VISUAL CHECK 2 INVENTORY RECONCILIATION F-] 3 VAPOR MONITORING❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br /> TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST SED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING l�/ GALLONS INERT MATERIAL? YES L_] NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED a SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM B (9-90) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> 3- g- q a FOR0a31g-Re <br /> i0 �.�°� <br />
The URL can be used to link to this page
Your browser does not support the video tag.