My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iSpecification No . : RGS0024-87 <br /> PART II - SPECIFIC CONDITIONS <br /> Section 12 - Portland Cement <br /> Concrete Paving <br /> 12 . 14 Curing : <br /> 12 . 14 . 1 Protect and cure finished concrete paving , complying <br /> with applicable requirements of Section 12 . Use curing <br /> and sealing compound or approved moist-curing methods . <br /> 12 . 15 Repairs and Protections : <br /> 12 . 15 . 1 Repair and replace broken or defective concrete , as <br /> directed by Engineer . <br /> 12 . 15 . 2 Protect concrete from damage until acceptance of work. <br /> Exclude traffic from pavement for at least 14 days after <br /> placement . When construction traffic is permitted , <br /> maintain pavement as clean as possible by removing <br /> surface stains and spillage of materials as they occur . <br /> Sweep concrete pavement and wash free of stains , <br /> discolorations , dirt and other foreign material just <br /> prior to final inspection. <br /> END OF SECTION <br /> XII-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.