My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specification No . : RGS0024-87 <br /> PART II - SPECIFIC CONDITIONS <br /> Section 13 -- Asphalt Concrete <br /> Paving <br /> repair displaced areas by loosening and filling , if <br /> required , with hot material . <br /> 13 . 10 . 4 Second Rolling : Follow breakdown rolling as soon as <br /> possible , while mixture is hot . Continue second rolling <br /> until mixture has been thoroughly compacted . <br /> 13 . 10 . 5 Finish Rolling : Perform finish rolling while mixture is <br /> still warm enough for removal of marks . Continue rolling <br /> until roller marks are eliminated and course has attained <br /> maximum density . <br /> 13 . 10 . 6 Patching : Remove and replace paving areas mixed with <br /> foreign materials and defective areas . Cut -out such <br /> areas and fill with fresh , hot asphalt concrete . Compact <br /> by rolling to maximum surface density and smoothness . <br /> 13 . 10 . 7 Protection : After final rolling , do not permit vehicular <br /> traffic on pavement until it has cooled and hardened . <br /> 13 . 10 . 8 Cleaning : Broom clean surface to eliminate loose <br /> material and dust . <br /> END OF SECTION <br /> XIII-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.