Laserfiche WebLink
NEW UNDERGROUND STORAGE TANKS <br /> The following - PLAN ADDITION CORRECTION SHEET <br /> g checked and/or underlined items are to be addressed <br /> GENE on plans: <br /> — °'i � • Provide the name and address of the facility. <br /> �2• Provide the tLrne, address,- <br /> owner sand hone numbers of the con_tracto_r_ s <br /> ), and w,operator(s). �— _ (_ ) fa c i 1 i ty <br /> �_3• Provide four complete sets of plans. <br /> Include specification sheets <br /> (One to be retained by this office). <br /> plans. equipment brochures <br /> monito <br /> in <br /> 0,x- 4. - _-___r 9. and response <br /> Provide plans to scale in nonerasable blueprint. <br /> CONSTRUCTION STANDARDS <br /> — _1 • Location(s) and number of tanks. <br /> ,2. T pe of tank(s) to be installed. <br /> xeel clad with fiberglass reinforced plastic. <br /> l 35,000 to 40,000 volt Holiday Test required before "setting"� ng" tank s) <br /> in ground. /p � ( <br /> B. Fiberglass <br /> 1 . Striker plate dimensions and materials. <br /> 2. Striker plates under all accessible openings. <br /> C. Nonclad steel <br /> 1 . Cathodic protection provided (including nuts, bolts, washers, etc. ) . <br /> a. Approved by a corrosion engineer or NACE technician. <br /> b. Document stating inspection method and frequency (Minimum semi- <br /> annual inspection required) . <br /> D. Other types of tanks <br /> 1 . Construction specification standards for durability. <br /> Tank Capacity (List specific gallonage) . O ovz % <br /> - Contents to be stored in each tank (Be specific). <br /> A. Verification of product compatability with the tank(s) , piping, monitoring <br /> device(s) , epoxy or silicone glues , etc. <br /> 1 . List testing organization and approval . <br /> _Z5. Provide manufacturers written installation instructions. ( Include all piping, <br /> monitors , tanks , etc. <br /> Note NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br /> is require on BOTH the Primary and Secondary containment systems. <br /> Double walled tanks using pressure or vacuum testing to monitor annular <br /> space are exempt from testing secondary container. <br /> Note - NFPA 329 "Precision Test" required upon completion of installations. <br /> One test result copy to be sent directly to this department from the <br /> testing company. <br />