Laserfiche WebLink
OPTION 2A <br /> ARTICLE 3, SECTION 2633/2634 <br /> MOTOR VEHICLE FUELS ONLY <br /> CONSTRUCTION <br /> 1 . Requirements : <br /> A. Approved tank construction material <br /> B. Leak interception and detection system whic�'complies with Article 3, <br /> Section 2631 (c) . <br /> C. Membrane liners must comply with Article 3, Section 2633(e) , (1 ) , (2) , <br /> (3) , (4) , ( 5) and are only allowed for piping systems (Department Policy) <br /> D. Demonstrate that the leak intercept-ion and detection systems protects <br /> ground water from contamination (Article 3, Section 2633(f) , (1 ) , (2) , (3) , <br /> (4) , (5) , (6) , (7) . <br /> E. Pressurized piping systems must be installed with a leak detector that is <br /> capable of automatically shutting off the product pumps. <br /> 1 . Any single wall component "tank or piping" requires daily inventory <br /> reconcilliation and annual precision tests as part of the monitoring <br /> program. <br /> F. Before covering, the tank(s) and system(s) must be tested to NFPA 30, <br /> Standards. <br /> G. Before use - the tank(s) and system(s) must be tested in accordance to <br /> NFPA 329. <br /> H. Provide soil profile of vadose zone if membrane liners are used. <br /> OPTION 2B <br /> ARTICLE 3, SECTION 2634 <br /> MOTOR VEHICLE FUELS ONLY <br /> MONITORING <br /> 1 . Re/gbirements (leak interception and detect <br /> io system(s ) ) . <br /> A Floor must be constructed on a firm base nd sloped to a collection sump. <br /> Access casings must be installed in accord ce to Article 3, Section <br /> 2634 (c) (1 thru 6) , (d) (1 ) . <br /> C. Submit written monitoring and response plan a stated in Article 3, <br /> Section 2634 (d) ( 1 -3) , 2634 (e) (1 -5) . <br /> D. Hard wiring of electronic monitoring systems is equired. <br /> E. Provide manufacturer' s written installation instructions. <br />