My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4747
>
2300 - Underground Storage Tank Program
>
PR0232482
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:38:22 PM
Creation date
11/7/2018 10:23:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0232482
PE
2361
FACILITY_ID
FA0003719
FACILITY_NAME
WEST LANE CHEVRON
STREET_NUMBER
4747
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10437010
CURRENT_STATUS
01
SITE_LOCATION
4747 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4747\PR0232482\BILLING 1990-2003.PDF
QuestysFileName
BILLING 1990-2003
QuestysRecordDate
1/23/2018 4:55:33 PM
QuestysRecordID
3768664
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE T�*T�r� TANK <br /> VL PIPING CONSTRUCTION(check dl mins TANK PAGE 2 <br /> UNDERGROUND PIPUJG Page 2.f 6 <br /> SYSTEM TYPE 0 1,PRESSURE 0 I.SUCTION 0 3.GRAVITY 458ABOVEGROUND PIPMG <br /> coNSTRucnoN ❑L ❑3 <br /> .LINED TRENCH 1199.SINGLE WALL 0 1.PRESSURE 0 2. SUCTION 0 3.OTHER 460 459 <br /> MANUFACTURER 0 2.DOABLE WALL 0 95.UNKNOWN ❑1.SINGLE WALL GRAVITY 0 95.UNKNOWN <br /> 2DOUBLE WALL 462 <br /> MANUFACTURER AO Smi ,th �99.OTHER <br /> ❑I.BARE STEEL ❑6.FRP COMPATIBLE wh461 MANUFACTURER op% METHArvo1 463 <br /> O 2.STAINLESS STEEL 0 L BARE STEEL [16.FRP COMPATIBLE W/I WA METHAN <br /> 0 7.GALVANIZED STEEL 0 Unknown 0 2. STAINLESS STEEL OL <br /> 0 3.PLASTIC COMPATIBLE W/CONTENTS 1:199. Other ❑3 ❑7.GALVANIZED STEEL <br /> ❑8.FLEXIBLE(HDPE) <br /> 0 4.FIBERGLASS . PLASTIC COMPATIBLE W/CONTENTS ❑8.FLEXIBLE(HDPE) ❑99 OTHER <br /> [14. FIBERGLASS <br /> [15.STEEL W/COATING 0 9.CATHODIC PROTECTION 464 <br /> Vil.PIPINescdD d ❑9CATHODIC <br /> ATHODIC.P <br /> ROTECTION <br /> G LEAK DETEC5. STEEL W/COATING 95 UNKNOWN <br /> UNDERGROUNDPPMG ( catePIr)(Adb , tnonhodn ullbeaubminMomebwlegm ) <br /> 465 <br /> rMONTHLY <br /> INGLE WALL PIPING ABOVEGROUND PIPING <br /> 466 i SINGLE WALL PIPING <br /> IPMG(Check all that apply): 467 <br /> IC LME LEAK DEFECTOR 3.0 GPH TEST PRESSURIZED PIPING(Cheek ell that apply): <br /> EAK,SYSTEM FAILURE,AND SYSTEM DIWSCONNECTION+P SNl7i i. ELECTRONIC LME LEAK DETECTOR 3.0 GPH TEST Wr pU7p PUMP <br /> ND VISUALALARMS SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ <br /> 01 GPH TEST AUDIBLE AND VISUAL ALARMS, <br /> . L INTEGRI71'TEST(O.IGPFi) 0 2. MONTHLY 01 GPH TEST <br /> 3.ANNUAL INTEGRITY TEST(0.1GPH) <br /> CONVENTIONAL SUCTION SYSTEMS 0 4, DAILY VISUAL CHECK <br /> [15.DAILY VISUAL MONITORING OF PUMPING SYSTEM+ CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> INTEGRITY TEST(0.1 GPH) TRIENNIAL PIPING 0 5. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> SAFE SUCTION SYSTEMS(NO VALUES M BELOW GROUND PIPING): 0 6. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> 0 7.SELF MONITORING <br /> GRAVITY FLOW SAFE SUCTION SYSTEMS(NO VALVES M BELOW GROUND PIPING): <br /> 0 7, SELF MONITORING <br /> ❑9.BIENNIAL INTEGRITY TEST(0.t GPH) <br /> GRAVITY FLOW(Check all tim apply): <br /> 118- DAILY VISUAL MONITORING <br /> SECONDARILY CONTAINED PIPING ❑9, BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> PRESSURIZED PIPING(Check all that apply): SECONDARILY CONTAINED PIPING <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL PRESSURIZED PIPING(Chxk all that apply): <br /> ALARMS AND(Chat one) t0, CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> 03' AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ALARMS AND(Check one) <br /> 0 b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILUREAND SYSTEM 0 a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> DISCONNECTION 0 b AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> 0c. NO AUTO PUMP SHUT OFF DISCONNECTION <br /> ®11. AUTOMATIC LME LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT Oc NO AUTO PUMP SHUT OFF <br /> OFF OR RESTRICTION 0 11. AUTOMATIC LEAK DETECTOR <br /> IN 12. ANNUAL INTEGRITY TEST(0.1 GPH) 0 12. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM <br /> SUCTION/GRAVITY SYSTEM <br /> 013. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS 013. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all mm apvly) <br /> 0 14. CONTINUOUS SUMP SENSOR EMERGENCY GENERATORS ONLY(Check ell that apply) <br /> AUDIBLE AND VISUAL ALARMS 1 A�PSP SHUT OFF• El 14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> 0 I5. AUTOMATIC LME LEAK DETECTOR(3.0 GPH TEST)WITH�O 7 FLOW AUDIBLE AND VISUAL ALpRf,15 <br /> SHUT OFF OR RESTRICTION 0 15. AUTOMATIC LME LEAK DETECTOR(3.0 GPH TEST) <br /> 0 16,ANNUAL INTEGRITY TEST(0.1 GPH) <br /> 0 17. DAILY VISUAL CHECK 0 16'ANNUAL INTEGRITY TEST(0.1 GPH) <br /> 017. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT 0 I.FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE <br /> DATE INSTALLED 46s ®2,CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS 0 S.DAILY VISUAL CHECK <br /> 9/28/90 0 3.CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR ❑5.TRENCH LINER/MONITORING <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS 0 6.NONE <br /> 469 <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I certify that the infarmaibn pmvidM herein is we and accurate to the best ofmy krpwledge. <br /> SIGNATURE OF0 TOR <br /> N.9Q,LrE7(I DATE <br /> NAME OF OWNER/OP TOR(pont) <br /> 5/30/02 470 <br /> Chevron Products Com an /D.R. LERI TITLE OF OWNER OPERATOR <br /> Permit Number(For baluu only) 413 <br /> Retail ESH Specialist 47' <br /> Pnsnh APWovcd(Farbwl use only) P.,,Ea sbn Date beat use only)l <br /> Pira u475 <br /> 1)PCF(1/99 reviged) <br /> 1'7d <br />
The URL can be used to link to this page
Your browser does not support the video tag.