Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANKS TANK PAGE 2 TANK <br /> VI.PIPINGCONSTRUCTIOIJ(Check all meta 1) <br /> UNDE&GROUND PIPING Page 2 or 6 <br /> SYSTEM TYPG ® I.PRESSURE ❑2.SUCTION ABOVEGROUND PIPING <br /> CONSTRUCTION W 1,SINGLE WALL 3.999,OTHER <br /> OTHER 4R 460 ❑1.PRESSURE ❑2. SUCTION <br /> ❑3.LINED TRENCH � 60 0 3.GRAVITY 459 <br /> MANUFACTUR ❑95. <br /> ER ®2.DOUBLE WALL 1 SINGLE WALL ❑95.UNKNOWN <br /> UNKNOWN ❑2DOUBLE WALL 462 <br /> . <br /> MANUFACTURER AO Smith ❑99.OTHER <br /> ❑ 1.BARE STEEL 461 MANUFACTURER <br /> ❑b.FRP COMPATIBLE wp00'6 METHANOL ❑1.BARE STEEL -- 463 <br /> O 2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑Unknown ❑6.FRP COMPATIBLE W/100A METHANOL <br /> ❑3.PLASTIC COMPATIBLE W/CONTENTS 2- STAINLESS STEEL [17.GALVANIZED STEEL <br /> ®4.FIBERGLASS118. <br /> ❑99. 011ier ❑3. PLASTIC COMPATIBLE W/CONTENTS <br /> �8.FLEXIBLE(HDPE) ❑8.FLEXIBLE(HDPE) 1199. OTHER <br /> ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTION 464 ❑4• FIBERGLASS 119.CATHODIC PROTECTION <br /> ATING❑5. STEEL W/CO <br /> VII.PIPING LEAK DETECTION(Cheek all theta I)(A descriW/CO themm�hodn -95.UNKNOWN 465 <br /> UNDERGROUND""NG ram shall be aobmiued to the bcal agency.) <br /> SINGLE WALL PIPING ABOVEGROUND PIPING <br /> °661 <br /> PRESSURIZED PIPING(Check ell shat apply): SINGLE WALL PIPING 467 <br /> ❑1.ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP$CRIT PRESSURIZED PIPING(Chack all that apply): <br /> OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ 111. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> AUDIBLE AND VISUAL ALARMS. SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ <br /> ❑2.MONTHLY 0.2 GPH TEST AUDIBLE AND VISUAL ALARMS, <br /> ❑3.ANNUAL INTEGRITY TEST(0.IGPH) Ef 2. MONTHLY 0.2 GPH TEST <br /> ❑l3.ANNUAL INTEGRITY TEST(0.IGPH) <br /> CONVENTIONAL SUCTION SYSTEMS 04. DAILY VISUAL CHECK <br /> (15.DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> INTEGRITY TEST(0.1 GPH) PIPING' Q 5. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> SAFE SUCTION SYSTEMS(NO VALUES IN BELOW GROUND PIPING): <br /> [17.SELF MONITORING 6. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> GRAVITY FLOW SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> ❑9.BIENNIAL INTEGRITY TEST(0.1 GPH) (17. SELF MONITORING <br /> GRAVITY FLOW(Check NI that avvlYL <br /> ❑8. DAILY VISUAL MONITORING <br /> SECONDARILY CONTAINED PIPING 139 BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> PRESSURIZED PIPING(Check all that apply): SECONDARILY CONTAINED PIPING <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITHAUDIBLE AND VISUAL PRESSURIZED PIPING(Chmk all that apply). <br /> ALARMS AND(Check one) 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ®a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ALARMS AND(Check otm) <br /> ®b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM 11 a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> DISCONNECTION ❑b AUTO PUMP SHUT OFF FOR LEAKS,SYS"FAILURE AND SYSTEM <br /> ❑c. NO AUTO PUMP SHUT OFF DISCONNECTION <br /> ® 11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT Oc NO AUTO PUMP SHUT OFF <br /> OFF OR RESTRICTION ❑11. AUTOMATIC LEAK DETECTOR <br /> ® 12. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM [112. ANNUAL INTEGRITY TEST(0.I GPH) <br /> SUCTION/GRAVITY SYSTEM <br /> ❑13. CONTINUOUS$UMPSENSOR+AUDIBLE AND VISUAL ALARMS <br /> ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all mat apply) <br /> ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF• EMERGENCY GENERATORS ONLY(Check all that apply) <br /> AUDIBLE AND VISUAL ALARMS ❑14. CONTINUOUS SUMP SENSOR WITS ACRO PUMP SHUT OFF <br /> [115. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW AUDIBLE AND VISUAL ALARMS <br /> SHUT OFF OR RESTRICTION 1115. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> ❑16.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑ 17. DAILY VISUAL CHECK [116.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑17. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT 1-1 1.FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE <br /> DATE INSTALLED 468 ®2.CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑4.DAILY VISUAL CHECK <br /> 9/28/90 ®3.CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUTOFF FOR 5'TRENCH LINER/MONITORING <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS [16.NONE <br /> IX.OWNER/OPERATOR SIGNATURE 469 <br /> I certify that the inf rmai ion provided herein is We am acwrate to the best of my knowledge <br /> SIGNATURE OF ON N R/ TOR <br /> ID.R,L2R,/ DA E <br /> NAME OF OWNER/OP TORS/N/02 470 <br /> (print) TITLE OFOWNER/OPERATOR <br /> Chevron Products Com any/D.R. LERI <br /> Retail ESH S ecialist °T' <br /> Perms Number(For bcel oseonly) <br /> ql Permit Approved(For real use only) <br /> Permit Expiratbn Dem(For bul use only) <br /> 473 <br /> 11 PC F(f/99 revised) <br />