Laserfiche WebLink
Pape <br />I NTRODUCT I OJN <br />1.0 SEMGid has adopted the following Hwa l t:h & Safety R l ars a"d <br />procedures for the removal ctfid/or closure of I. li"7dCwi.gi.Crl.iM <br />petroleum sto'f"c9ge tanksand associated piping. Th <br />purpose of this plan is to provide health and sa.fet�, <br />guidelines to be adhered to while all work is in <br />progress. <br />All personnel involved with tin.: tank removal 01, <br />associated activities will have an assigned <br />responsibility. The outlined responsibilities will <br />l <br />establish standards for personnel protective wear and <br />safety procedures, and will provide for emergency <br />actions which could arise-- during project operations. <br />