My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2007 PARTIAL TANK TOP UPGRADE & EVR PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
INSTALL 2007 PARTIAL TANK TOP UPGRADE & EVR PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 7:54:37 PM
Creation date
11/7/2018 11:10:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2007 PARTIAL TANK TOP UPGRADE & EVR PLANS
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\130\PR0231861\PARTIAL TANK TOP UPGRADE & EVR 2007.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II <br /> I <br /> tdIWllGl QI <br /> 1. ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED W THE FIELD BEFORE STARTING <br /> ANY WORK. ANY DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNER'S ENGINEER <br /> FOR HIS DECISION BEFORE PROCEEDING WITH THE WORK. REPORT TO OWNERS ENGINEER IF UNUSUAL <br /> - / SUBSURFACE CONDITIONS ARE FOUND. THE OWNERS ENGINEER WILL DETERMINE IF A SOILS REPORT So <br /> OR CONTINUING ON SITE INSPECTIONS ARE REQUIRED. ARCS <br /> 2. REMOVAL OF PIPING SHALL BE PERFORMED BY A LICENSED TANK SERVICE PROVIDER AS REQUIRED BY <br /> THE STATE AND LOCAL REQUIREMENTS. CONTRACTOR SHALL PROVIDE NOTIFICATION TO THE <br /> JURISDICTIONAL AGENCY RESPONSIBLE FOR INSPECTIONS ACCORDING TO THE PERMIT REQUIREMENTS. 9P WEST COAST PRODUCTS,UG <br /> ALLIANCE MANAGER, AGENT FOR BP: <br /> 3. ALL EXCAVATED MATERIAL SHALL BE TESTED FOR CONTAMINATION PRIOR TO REMOVAL FROM THE <br /> SITE. THE GENERAL CONTRACTOR SHALL SEGREGATE STOCKPILES ON SITE IF REQUIRED. THE <br /> CONTRACTOR SHALL DISPOSE OF CONTAMINATED AND UNCONTAMINATED EXCAVATED MATERIALS AWAY <br /> FROM THE SITE AT APPROVED AREAS ARRANGED AND PAID FOR BY THE CONTRACTOR. ALL <br /> UNCONTAMINATED BACKFILL MATERIAL REMOVED DURING EXCAVATION MAY BE REUSED AS BACKFILL <br /> DURING THE REINSTALLATION OF THE PIPING SYSTEM. <br /> 4. .GENERAL CONTRACTOR SHALL CONDUCT THEIR WORK IN ACCORDANCE WITH ALL FEDERAL, STATE AND Bovis <br /> Lend Lease <br /> LOCAL LAWS AND REGULATIONS. L <br /> 5. ALL ELECTRICAL WORK PERFORMED WITHIN CLASS 1 HAZARDOUS AREAS SHALL BE SEALED PER NEC GIOCIIlIAll1a.T)Ce <br /> AND UFC REQUIREMENTS. e6OEAURANOOLPHDRIVE-WILCODEBD60 <br /> CHICAGO:ILLINOIS 60601 <br /> Demolition Notes NATIONAL SITE ADAPT CONSULTANT, <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> DEMO <br /> PLAN <br /> SHEET NN& <br /> WILSON WAY TK1 - D <br />
The URL can be used to link to this page
Your browser does not support the video tag.