Laserfiche WebLink
"A" SIDE OF <br /> O. U DISPENSER SIDE OF <br /> 34 NDER DISPENSER C B 3q UNDER DISPENSER IMP CT VALVE SHEAR SECTION <br /> ?Q'NTAINMENT SUMP CONTAINMENT SUMP - <br /> STABILIZgR BAR UNLEADED TK3-3 TK3-3 STABILIZER BAR - DIS NEER 3b IMP /2" VAPOR S(SHEA SE <br /> ASSEMBLY PREMIUM AS A -, <br /> VAPOR <br /> MUST BE FLUSH <br /> RECOVERY UNL PREM VAPOR UNLEADED DISPENSER ISLAND 39 ) ! <br /> 1 W 92 OCTANE TOP OF CONCRETE DRIVE SLAB W/ TOP OF PUMP ISLAND <br /> Lb 92 OCTANE RECOVERY 87 OCTANE <br /> lor <br /> V) <br /> o o UNLEADED 1-1/2" 'x 1" <br /> w 87 OCTANE REDUCER BUSHING 4 <br /> n I <br /> V) I - - I a a . . <br /> ° I I 32 1-1/2" FLEX CONNECTOR e o bife e. . t.4 9' 4 - <br /> I-- I I ° (TYP. 4 PLCS.) 1-112" STAGE II VAPOR o <br /> U SHEAR IMPACT VALVE `� BULKHEAD FITTING 37 m <br /> � � I 31 RECOVERY EMERGENCY � c CA <br /> .SAND OR PEAGRAVEL <br /> O d I I I � 1.-1/2"x3" NIPPLE C a .c o ( <br /> 0w <br /> / :.1: B.ACKFILI, 1-1/2" COUPLING 0 ® .LO <br /> 1-1/2"x24" FLEX CONN. _U C <br /> a A _ _ A 32 1-1 2" FLEX __ _ L °c C <br /> - c- - - CONN. (TYP. 4 PLCSJ 2" SELL x MALE 0 '� <br /> TK3-3 TX3-3 ____ _ _____ __ - / C <br /> P P V q5°FIELBOW SS UNDER DISPENSER _C @ <br /> KU - - -- <br /> Z W <br /> O nQ "B" SIDE OF I (I BELL x MALE <br /> Z L lt. + (INSIDE SUMP) II � r 3 FIBERGLASS TEE W 34 <br /> m z EDGE OF TRENCH DISPENSER I T NATIVE SOIL / OD I <br /> C C T- <br /> : 2" REDUCING BUSHING Q C /C� T- <br /> DO <br /> "a <br /> z -jI II NOTE: ANY STEEL PIPE & FITTINGS NOTE: SEE TK4-3 FOR <br /> W Z 3" FIBERGLASS STAGE II T T EXPOSED TO BACKFILL TO MATERIAL LIST �/ "C " <br /> 2 _ 0 20 HAVE MIN. 20 MIL WRAP m <br /> 3 N VAPOR RECOVERY PIPE W/ 100% OVERLAP ON TO '3 '� Sys <br /> a = ANOR RECOVERY _ ° j FI ERGLASS PIPE FITTINGS <br /> EF <br /> U) <br /> 0 0 0 2" FIBERGLASS 45' ELL. (NP.) Vapor Recovery Piping at Dispenser O <br /> Lj PRODUCT _ - // O gnom . <br /> Z J LINE 0 $�3 3" FIBERGLASS TEE (TYP.) 30 1-EhR "IMPACDUVAL\EMERGENCY NOT TO SCALE: <br /> Q 0 W/ 2" REDUCING BUSHING N <br /> N o o ° DOUBLE POPPETED <br /> Z PRODUCT _ - (TYP. 2 PLCS.) _ C 0 � <br /> � LINE — THIS IS A VIEW FROM "B" SIDE OF DISPENSER 1-./2" IMPACT VALVE W// UNION lop <br /> 30 — O <br /> EAR SECTION MUST B$ FLUSH <br /> 1. <br /> R LINES <br /> Q I <br /> NOTES: <br /> TEOFOOT VAP VAPOR 0 LOPE FROM DISPENSERS TO TANKS 1/8" TOP OF CONCRETE DRIVE-SLAB TOP OF PUMP LAND) DISPENSER F DISPENSER IS 39 '•�C <br /> 0 SHEAR VALVE SHALL BE A TOP ENTRY VALVE. G ti. <br /> EDGE OF TRENCH SEE SECTION B ON THIS SHEET •� d - <br /> 21. 2" FIBERGLASS PRIMARY PIPE (TYP.) - i <br /> 3. ALL SHEAR VALVES SHALL BE SECURELY MOUNTED TO THE STABILIZER 4 4 a , a - � C <br /> 20 3" FIBERGLASS SECONDARY PIPE (TYP.) BAR ASSEMBLY TO ASSURE VALVES WILL TRIP AND SHEAR UPON AN G <br /> IMPACT ON THE DISPENSER OF DESIGN CONDITIONS. ,a , <br /> C B <br /> 3" FIBERGLASS TEE AND 4. ALL UNDER DISPENSER CONTAINMENT SUMPS AND FITTINGS ARE PLUMBED BY * ' ' ' a •d < <br /> 3" FIBERGLASS 45' ELL. (TYP.) 3 TK3- TK3-3 THE CONTRACTOR. o COMPRE 51 Y.L <br /> (SECONDARY) "' CLAMP (SI t` #' <br /> 5. THE LOCATION OF THE PRODUCT AND VAPOR RECOVERY PIPING STUB-UPS SHALL <br /> BE ASESHOWN CONTRACTOR IS RESPONSIBLE FOR CORRECT ORIENTATION SAND OR PEAGRAVEL 1-1/2"x3" NIPPLE (� <br /> Plan View Detail (Blending) OF THE DISPENSER TO ACCOMMODATER INCORRECTLY INSTALLED PIPINGNWI L BLE WORKINGS BACKFILL BULKHEAD FITTING 36 1-1/2" COUPLING <br /> CONTRACTORS OWN EXPENSE. \ ----- _j <br /> 32 1-1/2"x24" FLEX CONN. <br /> 11 �NO'T <br /> Tree Product MPD Pring A Section Shear Valve Seption <br /> Z 1 -' 2" BELL x MALE I t t <br /> (� \ n (PRIMARY PIPING) ' <br /> ""' \ SCALE: NOT TO SCALE: �� <br /> 1° P P V 34 UNDER DISPENSER <br /> 11 3"x2 TEST REDUCER CONTAINMENT SUMP C � • <br /> DISPENSER AUXILIARY r `f <br /> JUNCTION BOX (INTERCOM) QJ �' <br /> "A" SIDE OF <br /> NATIVE SOIL <br /> LL DIS SIDE OF DISPENSER NOTE: ANY STEEL PIPE FITTINGS NOTE: .SEE TK4-3 FOR v r <br /> Z DISPENSER DISPENSER {ISI I EXPOSED TO BACKFILL 0 <br /> �(� HAVE MIN. 20 MIL 14 P MATERIAL LIST v <br /> ® JUNCTION X W% 100% OVERLAP N TO - Cd C f ' <br /> U F ERGLASS PIPE F INGS _ <br /> r <br /> UPENPRODUCT - L = tax <br /> DISPENSER 26 ^` <br /> 1 IMPACT VALVE W/ UNION TOP 30 - W <br /> N SH R SJECTION MUST BE FLUSH <br /> ® W/ TOP PUMP ISLAND) <br /> SEAL OFF SPLASH GUARD Product Piping at Dispenser 3 <br /> C <br /> - - - « b T: <br /> 6" RAISED FULL RADIUS DISPENSER ISLAND 3g NOT TO SCALE: ® ® 3, <br /> SEE DETAIL #17 ON TK3-4 0i co <br /> C 008 <br /> - - -� TOP OF CONCRETE DRIVE SLAB <br /> < ' <br /> \ ° • a � °a. COMPACTED SAND <br /> A AGRAVLBACKFILL <br /> OR CC 7C3 <br /> Cd 6' AE OR SURFACE C U L j <br /> d < MAWR.' L WHERE TOP OF FINISHED SURFACEco <br /> L" a .a 4' ea REQ D. BY OWNERS <br /> d. ' a ENGINEER �- - C <br /> � . : _ +S� <br /> 2" PRIMARYCOMPRE SIO U G r ' <br /> 21 CONTAINMENT PIPE CLAMP (STYP.r 1-1/2"x3" NIPPLE _ __ _ tO _i `v g ® Q++ <br /> _ ad `.J <br /> Of 20 3" SECONDARY 36 BULKHEAD FIT7 G 1-1/2" COUPLING 3/4"C, DISPENSER POWER w r- �O <br /> C7 CONTAINMENT PIPE AND COMMUNICATION TO BLDG. '' <br /> 32 1-1/2"x24" FLEX CONN: / (1 CONDUIT HOMERUN PER DISPENSER) <br /> e10 •'' <br /> C) -- --- - --- - - - : R VAPOR RECOVERY- LINE • ` <br /> U <br /> O m 12" 7"+ 7"+_ 2 PRODUCT PIPING LINES <br /> a a 38 'IYR . z W <br /> 3/4"C,. INTERCOM TO BLDG. N 2t'n 4 �<. <br /> m 11 3"x2" TEST REDUCER 34 UNDER DISPENSER CONTAINMENT (ONE CONDUIT PER DISPENSER) k� E <br /> T O W U <br /> m O SUMP SIZE TO MATCH . ¢ 2 0 o U W W <br /> DISPENSER FOOTPRINT. NOTE: CONTRACTOR SHALL SURFACE <br /> PRECAUTIONS TO PROTECT HOLE AND 0 Q" 3 = m m a <br /> 2" BELL x MALPIPING) <br /> - NOTE: SEE TK4-3 FOR STAND ALONE SPENSER TRENCHES FROM SURFACE WATER RUNOFF UNTIL PAVING IS REPLACED. 2 tl c> oI of 3 <br /> (PRIMARY PIPING) MATERIAL LIST 35 MONITORING SEN MOUNTING _ a J o <br /> o a OF SENSOR NOT 5 N. Typical Piping in Trench - a 2 0 8 o o <br /> D t- U U .zz <br /> a N4D$ NOT.TO' SCALE: rnaager rebase date <br /> UNDER OISPEN R CONTAINMENT SHALL BE EQUIPPED <br /> WITH A .STAND AL NE, ELECTRONIC SENSOR WITH A - <br /> POSITIVE SHUTDOW THAT WILL INTERRUPT POWER TO 1�15�9H <br /> Lij THE DISPENSER. - NO. ARCO PRODUCTS COMPANY MASTER REVISIONS <br /> -- - <br /> CD <br /> VAPOR RECOVERY NOT SHOWN THIS VIEW ANY STEEL PIPE AND F NGS EXPOSED TO BACKFILL NO. DATE REVISORY _ PROJECTED pro}Oxe, drawn by <br /> TO HAVE, A MINIMUM 20 WRAP WITH 100% OVERLAP OMF'CR 02/1111II <br /> Typical Under Dispenser ON TO FIBERGLASS PIPE FI NGS. PLAN CHECK pr*d- / t® <br /> cw <br /> N n Containment Sump ALL FITTINGS IN ARE INSTALLED BYNTDER DISPE HE CONTRA EDR. ELECTNMENT RICAL SUMP' �Fi�SE 5468 <br /> Z J 1G PENETRATIONS ENTER FROM THE " SIDE OF THE <br /> - �+ <br /> CD 3 NOT TO SCALE: - DISPENSER. PRODUCT AND VAPOR RECOVERY PENETRATIONS KBIT. d»et l tyle <br /> z ARE LOCATED ON THE "B" SIDE OF HE DISPENSER. RELEASE <br /> Ld i THE DISPENSER. AS- TK3•-3 <br /> T Of <br /> AR928\928TK3-3.DWG <br />