Laserfiche WebLink
IED PROGRAM CONSOLIDATED FO <br /> ( �p� UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Pae 1 of 2) <br /> 490-1. <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY, 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> 3. <br /> BUSINESS NAME(Same as Facility Name or DBA) My Mini Malt <br /> BUSINESS SITE ADDRESS 103. CITY <br /> 1756 N. Wilson Way Stockton <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions or annually,whichever is more frequent Such work must be performed by qualified ep rsonnet.[T3 cca§2632,2634,2638,2"11 <br /> 490-3e. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 49836. <br /> III. MONITORING LOCATIONS <br /> 490<. <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) n lak(Il <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED [:1c.PRESSURIZED El d.UNDER VACUUM 490'6 <br /> PANEL MANUFACTURER: INCON 490-1. MODEL#: TS-1007 490-8. <br /> LEAK SENSOR MANUFACTURER: TSP 490-9 MODEL#(S): STD-101, EIS 49M0. <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26431 49041' <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-u. MODEL#(S): 490.15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY 49M6. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-I1. <br /> 490-18. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19_ <br /> 490.20. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.11 -------k90_ <br /> ❑64.WEEKLY MANUAL TANK GAUGING(MT G)[23 CCR§26457 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS -T1 <br /> 490 2T. <br /> 490-T3. <br /> 5.TANK INTEGRITY TESTING PER[Zl CCR§2643.11 <br /> 490-24. <br /> _ TEST FREQUENCY: p�NNUALLY ❑ b.BIENNIALLY ❑ c.OTI-IER(Specify): 490-25. <br /> 490-26. <br /> ❑ 99.OTHER(Specify): - 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hatap an <br /> - tara l <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490"28. <br /> I"cc' SECONDARY CONTAINMENT IS: Z a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> §26361 PANEL MANUFACTURER:INCON 490-30. MODEL#: TS-1001 490-31. <br /> LEAK SENSOR MANUFACTURER: TSP 490-3z. MODEL#(S): ULS 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e,TURBINE)SHUTDOWN. E a.YES ❑ b.NO 49034. <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49035. <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DET>: ' §2676 q( �aCf'--� 8�2 rot6rrQ <br /> MLLD MANUFACTURER(S): /hi[�T IV K- ry ���SE� 49837' MODEL#(S): FX-1V '-1� 2XO9o-38. <br /> [1 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELLY PERFORMS 3.0 g.p.h.LEAK TESTS.in CCR§2636] 490.39. <br /> ELLD MANUFACTURER(S): 49040. MODEL 4(S): 490.41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 gF.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN, ❑ a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44. <br /> 49045. <br /> ❑ 4.PIPE INTEGRITY TESTING. <br /> TEST FREQUENCY: E] a.ANNUALLY ❑ b.EVERY 3 YEARS [I c.OTHER(S ecify), 490.46 <br /> ❑ 5.VISUAL PIPE MONITORING. I� 4904e. <br /> 4 <br /> FREQUENCY: E] a.DAILY [Ib.WEEKLY ❑ C.MIN.MOiTDB.Y&EAC[3TIME SYSTEhPOPERA"iED• 490 9. <br /> _•Allowed for monitoring ofunburied emugcnCy generetuPoeliP ping only Dw HSC§25281.5@)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(.)(3)7 4�0-s0. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> 490- <br /> ❑ <br /> 99.OTHER(Specify) _sr.:.:- !r_,.-_>.:-: 490.53. <br /> UPCF UST-D(12/2007)-1/4 www.un]docs.org <br />