My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1756
>
2300 - Underground Storage Tank Program
>
PR0231300
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 11:50:48 AM
Creation date
11/7/2018 11:13:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231300
PE
2361
FACILITY_ID
FA0001858
FACILITY_NAME
MY MINI MART
STREET_NUMBER
1756
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11721005
CURRENT_STATUS
01
SITE_LOCATION
1756 N WILSON WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\1756\PR0231300\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 PLAIN REVIEW AtrfD OPERATL"4G PEMN(I ` FEES <br /> a. New facility plan review fee of 5624.00 (8 hour minimum per facility), $170.00 fee per <br /> rank, plus 556.00 state surcharge fee per tank is due at time of plan submittal. <br /> b. New installation of an additional tank at an existing facility is 5624.00 pian review fee (8 <br /> hour minimum per facility) plus $170.00 fee per new tank, and 556.00 per tank state <br /> surcharge fee. <br /> c. It should be noted that a S624.00 pian review check fee required for each submittal allows <br /> for up to eight (8) hours of staff review and/or inspection time. Additionah time spent on <br /> plan review, meetings, inspecuons, phone or office consultations will be billed to the <br /> applicant at a tate of 578-00 per hour. <br /> d. The maximum review time for LIST installation plans is 40 working days. A preliminary <br /> review will be conducted by the PHS-MD within 20 working days of submittal date to <br /> identify any ,gross plan deficiencies. <br /> e. If gross deficiencies are identified, the plazas will be returned with a checklist identifying plan <br /> deficiencies. <br /> f. To expedite the reviewof installation plans, time and a half per hour overtime fee may be <br /> submitted to have review completed within 10 working days of submittal date if staff is <br /> available to perform the review. <br /> PLAN REVTEW GUIDELl�+-ES <br /> a. The enclosed pian review sheet is io be completed and submitted with rhe three sets of <br /> drawings to PHS-EHD. <br /> b. A copy of the California UST Regulations may be obtained from the California State Water <br /> Resources Control Board at (916) '_27- 303. <br /> C. Permits and/or plan check approval may also be required by the San Joaquin Valley Unified <br /> Air Pollution Control Distract, the County/City Building Department and the Fire District in <br /> your respective area. <br /> d. A minimum of 3 inspections will be conducted on the LIST system installation. A S78 per <br /> hour inspection fee shall be charged for additional inspections or reinspection as required- <br /> (See required inspections below) <br /> e. Applicant/contractor to adhere to the approval plan and any change or deviation shall be <br /> reported to and approved by PHS-EHD prior io instailation. <br /> f. The application for installation of underground tanks is only valid for the calendar year in <br /> which it has be--n issued_ A permit may be extended into the next calendar year if a letter is <br /> sent to PHS-EHD requesting this extension thirry days prior to the end of the calendar year. <br /> A one time, one year extension may be granted by PHS-EHD upon receipt of this letter- <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.