Laserfiche WebLink
UST SYSTEM DRAWING INFORMATION <br /> 1. X Three complete sets of plans (include .manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. X Plans drawn to scale in non-erasable print. <br /> 3, X Plot plan to show location of tanks and all associated piping. <br /> ;. X Striker plates or drop cube-mounted bottom protectors illustrated below ail accessible openings. <br /> 5. X Tank cross-sectional aiagram. <br /> 6. X Derail of canis, associated piping, excavation and cover.. <br /> 7. X Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> drzicte 3, Section 2531 (b) 3 26351 <br /> 3. X verification of product compatibility with the cank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, erc. <br /> 9. X Manufacturer`s written installation instructions for tank(s), piping, monitoring devices, arc. <br /> 10. X At the installation site, prior to installation, a tightness test shall be performed on both primary (1°) and <br /> secondary (Z°) containment systems before covering. [Section 2635 (a) (3) b (4)I <br /> 11. X Tank integrity test required upon completion of installation with rank in operating condition. Test results to be <br /> submitted directly to PHS-AHD from the testing company or owner of facility. [Health & Safety Cade, Oivision 20, <br /> Chapter 6.7, Section 25291 (h)I <br /> 12. TANK COMPMITION <br /> TANK t M Z <br /> CAP.ACiTY 3,00 a1 9,000 gal <br /> MANUFACTURER IST Sbeel <br /> COMPOSITION <br /> MODE= <br /> i <br /> PRODL'G' ` <br /> CORROSION PROTECTION I ! II f <br /> J.L. '_ISTED I <br /> -COMPAfISILITY WITH 100% j <br /> METHANOL <br /> 13. TANKCs) TO BE INSTALLED <br /> X A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-meratlic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> X (2) Vacuum applied to interstitial space. <br /> 3. Fiberglass <br /> (1) insrailation instructions require an air zest and soap bubble rest prior to installation_ <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure zest). <br /> C_ Non-ctad steel tank [Section 2635 (a) (2) (A)I <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> _ (2) Field installed cathodic protection systems designed and terrified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems zo 5e inspected no Less than every 60 days. <br />