My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1756
>
2300 - Underground Storage Tank Program
>
PR0231300
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 11:50:48 AM
Creation date
11/7/2018 11:13:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231300
PE
2361
FACILITY_ID
FA0001858
FACILITY_NAME
MY MINI MART
STREET_NUMBER
1756
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11721005
CURRENT_STATUS
01
SITE_LOCATION
1756 N WILSON WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\1756\PR0231300\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Piping system layoute Trenching,bedding and backfilling <br /> 6Although fiberglass pipe has excellent strength,it roust be protected against impact <br /> which may occur from improper handling or during backfilling. <br /> • Provide a trench width equal to the pipe diameter plus six inches on each side. <br /> Separate multiple lines by at least 4 inches.Referto Fig.6-1. <br /> • Provide a minimum of 18 inches of select backfill between the top of the pipe and <br /> unpaved ground surfaces. <br /> • Provide a minimum of 4 inches of select backfill between the top of the pipe and <br /> reinforced concrete pavement(4 inches minimum thickness). <br /> • Provide a minimum of 8 inches of select backfill between the top of the pipe and <br /> asphalt pavement(2 inches minimum thickness). <br /> • Slope the trench bottom evenly from the dispensers back to sumps or tanks at a <br /> minimum t/a iii of slope. <br /> • The trench bottom must be free of hard or sharp objects. <br /> • Grade the trench bottom with at least 6 inches of select backfill to provide firm, <br /> even support for the pipe.Compact the subgrade well to prevent differential <br /> settling. <br /> • Protect the pipe from impact during backfilling and abrasion during operation by <br /> surrounding it with four to six inches of select backfill such as washed sand,pea <br /> gravel(3/4-inch maximum)or crushed stone('h-inch maximum). <br /> • Wrap pipe lying near concrete with rubber or foam padding to avoid direct <br /> contact with the concrete. <br /> None-� <br /> Asphalt <br /> 2(min) <br /> / Concrete <br /> 4(min) 18(min) <br /> ^ 1 <br /> �- <br /> � (min) <br /> 4(Mir) <br /> Fig.6-1.Use only select materials for <br /> bedding and backfilling Dualoy 30001L fuel r Select backfill 6(min) <br /> handling systems.Native materials are rarely <br /> suitable and should not be used. <br /> Native 4(min) 6(min) <br /> soil <br /> Fig.6-2.During layout,bonding and <br /> inspection,support the piping on <br /> 2x4 blocks to keep the joints clean <br /> and to keep bedding <br /> out of the pipe. <br /> r <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.