My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1756
>
2300 - Underground Storage Tank Program
>
PR0231300
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 11:50:48 AM
Creation date
11/7/2018 11:13:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231300
PE
2361
FACILITY_ID
FA0001858
FACILITY_NAME
MY MINI MART
STREET_NUMBER
1756
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11721005
CURRENT_STATUS
01
SITE_LOCATION
1756 N WILSON WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\1756\PR0231300\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08-13-1999 04=06PM FPOM 9EMM TO 4683433 P.05 <br /> tions can <br /> Unhke competitive fiberglass and annular <br /> ndel rimary which macee betw9en secondary po ble nested together,tjacent hus providing e w <br /> steel piping,Dualoy 3000/L has no p <br /> containmentto test the integrity of the <br /> threads to cross or strep.A slightltw st and to mon for the productlineduring primary access to the line <br /> nding,testing and <br /> as the spigot is inserted into the inspection.No other containment <br /> time, <br /> - d the joint is complete.The joint any system is easier to install, <br /> can usually be made by a single All pipe and fittings in an Ameron <br /> worker.Compare this to the effort containment system are manufac- <br /> needed to screw steel pipe together, tured from the same fiberglass <br /> where it frequently takes two workers reinforced resins as the primary,$o <br /> to join even 2-Inch pipe--to say the containment piping has the same <br /> nothing of larger Sizes.An important excellent chemical resistance as the <br /> paint,since 1 out of 7 steel pipe product lines. <br /> joint failures can be attributed to Dualoy 3000/L containment systems <br /> Inose fittings. are easy to install.The pipe is so <br /> smooth on the outside that the <br /> *, contractor need only remove the .7 i <br /> surface gloss at the ends of the Ripe <br /> before installing the containment <br /> fittings:no special <br /> i Iend <br /> preparation ation is <br /> required,Only Ameron can offer such ,artwthePnmarYhas Pa WlnsPec '' <br /> sectipns of Inspevoi�topog <br /> simple installation. &VjQrred with mducing cauOngs. <br /> Complete inspectabiltty <br /> UL-fisted alcohol piping <br /> Ameron Inspection Containment UL- <br /> piping employs pipe of two slightly Systems <br /> different diameters in the secondary Amey was the first in the fiberglass <br /> The <br /> pipe industry to obtain U <br /> qo ck adheswjorrd rs one reBscn a twoULlisting for <br /> man crew can rut in m"Dualoy 3000/L Inalcohol service in underground piping <br /> 3 days than a three-man steel crew in a day's systems.Standard Dualoy 30-0()/i_is <br /> compatible with allowable limits of <br /> alcohols{4.75%methanol; 10% <br /> 'ell range of UL-listed sizes - ethanol)and ethers(15%MTBE. <br /> Dualoy 3000/1-is the Only line of Ameron also offers a full range of <br /> fiberglass pipe,fittings and adapters fittings and adhesives which can be <br /> available in a full two-through 6-inch used with standard Dualoy 3000A- <br /> size range with Underwriters' pipe for Systems carrying ajcohol <br /> Laboratories listing.Ameron thus blends and straight alcohols such as <br /> offers UL4sted components not only 0. M85 and M100. <br /> for typical small-diameter service -.1 Resistant to sunlight <br /> station installations,but also for large- _ In the final step of the unique <br /> olume facilities such as bulk fuel f Dualoy 30W/L pipe manufacturing <br /> Lerminals,marinas and central <br /> fuel oil systems. fit. process,a uniform resin <br /> coating <br /> exterior <br /> coating is added to protect the resin- <br /> Secondary containment - n- glass band otthe structural wall <br /> systems from UV radiation.As a result, <br /> Ameron Dualoy 3000/L secondaryD Ialoy 3000/L car~be stored out of <br /> containment systems use rigid, �•.yq doors without special precautions <br /> heavy-wall outer fittings with the next before installation. <br /> I<3rger size pipe to enclose the tamer Adjacent Wigths oflnspectiun conminment <br /> j p pe totally from turbine to dispenser. p pe my be nested roWtner to MvtUe Edsy <br /> i <br /> These systems Provide a continuous access to pRma�rt��a"o�f� <br /> TOTAL P.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.