<br />  																						CSENERAL  NOTES 																																																					Cofifiroth
<br />      																																									PIPING    				3"  ENVIROFLEX  &  ENVIROFLEX  FITTINGS
<br />   																						1.       CONTRACTOR  EMPLOYEES  TO  HAVE  COMPLETED    40  HOURS  OSHA TRAINING				SECONDARY    																			-      -  	-   	- 			-  	-   	-
<br />     																							COURSE  PRIOR  TO  THE  START  OF  WORK.    (CERTIFICATE  REQUIRED)    					PRODUCT
<br />   																						2.       CONTRACTOR  EMPLOYEES  TO  HAVE  COMPLETED  SMITH  FIBERGLASS  RED  THREAD       																																		-
<br />																																																															I    r(�      _ 									1     I
<br />     																							IIA TRAINING  (CERTIFICATE  REQUIRED).    CONTRACTOR  SHALL  COMPLETE THE				NOTE:  PERSONS  INSTALLING  PIPING  MUST  BE  CERTIFIED  AS  HAVING  BEEN 									r       								1,
<br />    																							"FIBERGLASS  PIPING  SYSTEMS  INSTALLATION  CHECKLIST  FOR  UNDERGROUND				TRAINED.  BY  SMITH  FIBERGLASS  &  ENVIROFLEX  (TOTAL  CONTAINMENT  INC.)    																										Associates��®�I�t��
<br />     																							PETROLEUM  PIPES"  AND  SHALL  FURNISH  TO  SUTTON  &  ASSOCIATES  INC.     																													-       	-	-
<br />   																						3.       CONTRACTOR  TO  HAVE  BEEN  TRAINED  BY    FLUID  CONTAINMENT  TANK  IN  TANK   			STEEL  PIPING: 	ALL  PIPING  OTHER  THAN  FIBERGLASS  &  ETHREADLEX  TO								'      			49'-0'						I' 0' MIN
<br />																																																																																		gyp`
<br />     																							INSTALLATION  (GOINS  ENVIRONMENTAL WILL  VERIFY WITH  FLUID  CONTAIN-    				DE  BLACK  ISDN  (GALVANIZED  PIPE  IS  NOT  ALLOWED).    PIPE  THREAD
<br />     																																									COMPOUND  IS  TO  BE  RECTOR  SEAL  NO.  7.    ALL  STEEL  PIPE  BELOW  GRADE  IS
<br />     																							MENT)    CONTRACTOR  WELL  COMPLETE  THE  TANK  INSTALLATION  CHECKLIST  				TO  DE  DOUBLE  WRAPPED  WITH  !0  MIL.  PVC  TAPE.    ALL  TANK  RISERS  T❑  BE       								L_    															Architects   &
<br />     																							(SUPPLIED  TO  CONTRACTOR  BY  FLUID  CONTAINMENT  DURING  TANK  DELIVERY)
<br />     																							AND  SHALL  FURNISH  TO  SUTTON  &  ASSOCIATES  INC. 								FIBERGLASS  COATED  THE  FIRST  6"  BEGINNING  Al  THE  TANK  TDP.
<br />       																																																																		-I -     		-											Planners
<br />   																						4.       CONTRACTOR  TO  DEVELOP  A  SPECIFIC  SITE  SAFETY  PLAN  FOR  TANK  INSTALL-   		12.     INSTALL  NEW  VENT  RISERS AS  SHOWN  ON  SITE  PLAN,    INSTALL  SWING
<br />     																							ATION  PRIOR  TO  THE  START  OF  WORK.    CONTRACTOR  WILL  CONDUCT  WEEKLY    			JOINTS AT  BOTTOM  OF VENT  RISERS.    																	I  		9
<br />     																							JOB  SITE  SAFETY  MEETINGS  WITH  IT'S  EMPLOYEES  AND  THE  MEETING  MINUTESm       o    		w  									2115  J  STREET,  SUITE  213
<br />     																							WILL  BE  SUPPLIED  TO  SUTTON  &  ASSOCIATES  INC.   							13.     PIPING  SYSTEMS  SHALL  BE  TESTED:      																I       L  -I				-� n�--)       I     z      						SACRAMENTO,    CA.    95816
<br />    																						5.       CONTRACTOR  SHALL  HAVE  THE  FOLLOWING  LICENSES: 								A.      2"  -  50  PSI  AND  APPLY  SOAP  SOLUTION.    												I      	I       						¢. s�   l      		I       					PHONE:       (916)  443-2560
<br />     																							A.       GENERAL  ENGINEERING "A„												B.      3"  -  40  PSI  AND  APPLY  SOAP  SOLUTION.  														I    		I  				rs w   I       I  N  							FAX    	(916)  448-6583
<br />     																							B.       HAZARDOUS  MATERIAL  SUBSTANCE  HANDLING     								C.      3"  SECONDARY  -  5  PSI  AND  APPLY  SOAP  SOLUTION.
<br />    																						6.       CONTRACTOR  SHALL  HAVE THE  FOLLOWING  INSURANCE.    CONTRACTOR  SHALL      			NOTE:    MARK  PRESSURE  ON  GAUGE  WITH  ELECTRICAL TAPE AT  BEGINNING  OF  TEST.     								L  _I    						I      							© 1996  LEX  COFFROTH  &  ASSOCIATES
<br />     																							HAVE  PROOF  OF SUCH  INSURANCE  ON  FILE  WITH  SUTTON  & ASSOCIATES  INC.    			PRESSURE  (AS  INDICATED  ON  GAUGE)  SHALL  HOLD  FOR  (1)  HOUR AND  BE       											_ 			_     		'     							PLANS  MAY  NOT  BE  REVISED,  COPIED,  OR
<br />     																							BY  NAMING  OWNER  AS "ALSO  INSURED"     										WITNESSED  BY   																				e` -       							JJ    							REUSED WITHOUT  PRIOR WRITTEN PERMISSION
<br />    																																																																�[` 								_  		I       					OF     LEX  COFFROTH,     ARCHITECT.
<br />     																							EMPLOYEES  LIABILITY  WITH  A  MINIMUM  LIMIT  OF  LIABILITY  OF  $1,000,000  FOR   		14.     CONTRACTOR  SHALL  PROVIDE  DOCUMENTATION  OF  A  DYNAMIC  BACK  PRESSURE
<br />     																							EACH  OCCURRENCE.   														TEST  OF  ALL VAPOR  RETURN  LINES.     																																	SEAL:
<br />    																																								l5.     CONTRACTOR  SHALL  DO  ANY  OTHER  TESTING  AS  REQUIRED  BY  LOCAL  REGULATION.  						-      -  	_   						-  	-       -     								V,� to�ARC,"'
<br />     																							COMPREHENSIVE  GENERAL  LIABILITY,  INCLUDING  CONTRACTOR'S  PROTECTIVE     																																														�G.Pe       fq.
<br />     																							LIABILITY,  COMPLETED  OPERATIONS  LIABILITY,  AND  CONTRACTUAL  LIABILITY,    																															501E PINS
<br />     																							WITH  A  COMBINED  SINGLE  LIMIT  OF  NOT  LESS  THAN  $1,000,000  PER  OCCUR- 		16.     PRESSURE  (5LBS.)  ON  THE  PIPING  SECONDARY  SPACE  SHALL  BE  MAINTAINED  UNTIL
<br />     																							RENCE  FOR  BODILY  INJURY AND  PROPERTY  DAMAGE.  								AFTER  THE  CONCRETE TANK  AND  DRIVE  SLABS  HAVE  BEEN  POURED  AND  SHALL  BE
<br />      																																									WITNESSED  BY     																																							.ns;   •x    »:      c
<br />     																							AUTOMOBILE  LIABILITY  COVERING  USE  OF  ALL  OWNED  HIRED VEHICLES  WITH
<br />     																							A  COMBINED  SINGLE  LIMIT  OF  SINGLE  UNIT  OF  LIABILITY  OF  NOT  LESS  THAN    		17.     REPAIR  FUEL  ISLANDS AS  SHOWN  ON  DRAWINGS.  															I-  										O  							�f
<br />     																																																																			I       			I      	0      										9
<br />     																							$1,000,000  PER  OCCURRENCE  FOR  BODILY  INJURY AND  PROPERTY  DAMAGE. 																															2 LAPS
<br /> 																																																																					$4'-0'      						`^      							0P  CALF ,
<br />     																																								18.     BRAVO    BOXES,  TURBINE  SUMPS,  AND  OVERFILL  BOXES  ARE  TO  BE  WATER  TESTED     																			@
<br />    																						7.       GENERAL  CONTRACTOR  TO  FURNISH  ALL  LABOR,  MATERIAL,  EQUIPMENT,  AND       			AS  FOLLOWS: 																									15'-l'
<br />     																							SERVICES  NECESSARY  FOR OR  REASONABLY  INCIDENTAL  TO THE  SATIS-																																													CONTRACTOR:
<br />      																							FACTORY  COMPLETION  OF  ALL  WORK  SHOWN  ON,  CALLED  FOR,  OR  REQUIRED  BY       		1•	FILL WITH  WATER  TO  HIGHEST  PENETRATION.       																														r
<br />     																							THE  DRAWINGS.   															2.	SPRAY  PAINT TOP  OF  WATER.    															a      																	FILLNER
<br />    																						8.       ALL WORK  SHALL  BE  PERFORMED  IN  ACCORDANCE  WITH  THE  UNIFORM  BUILDINGCONSTRUCTION
<br />      																							CODE,  UNIFORM  FIRE  CODE,  NATIONAL  ELECTRICAL  CODE,  CALIFORNIA  UNDER-  		19,     ALL  CONDUIT  IS  TO  BE  3/4"  (  MINIMUM)  RIGID  CONDUIT.    MIN  BURIAL  ®  24"       											49' AT 1:2 SLOPE
<br />      																							GROUND  STORAGE  TANK  REGULATIONS,  OSHA  CONSTRUCTION  SAFETY  ORDERS,
<br />     																							AND  ANY  OTHER APPLICABLE  STATE,  CITY,  OR  COUNTY  ORDINANCES. 				20.     INSTALL  MONITORING  SYSTEM  WITH  LIQUID  SENSORS  IN  EACH  TANK  ANNULAR  SPACE  											SECTION A 											INC.
<br />    																						PERMITS       															AND  IN  TURBINE  SUMPS,    INSTALL  MONITOR  CONTROL  PANEL  IN  EXISTING  BUILDING     					RECOMMENDED LAYOUT FOR 3-10M GALLON T"6 USING DUPONT 'TYPAR'
<br />      																																									AS  DIRECTED  BY  OWNER.    INSTALL  LIQUID  LEVEL  PROBES  IN  TANKS.
<br />																																																															SpUNBONDED POLYPROPYLENE STYLE 34014 OZ/5.Y. FABRIC, 15'-1'WIDE
<br />     																						1.       PERMITS TO  BE  SECURED  BY  OWNER  AND  SUPPLIED  TO  CONTRACTOR.  CONTRAC-      		SEE  SITE  ELECTRICAL  PLAN  FOR  TANK  CONDUIT  CONFIGURATION.    THE  EXTERNAL 						MATERIAL.  ROLL$ AVAILABLE IN100, 300,AND 1,000 YD. LENGTH6.  FOR 							4061   SEAPORT  BLVD.
<br />      																							TOR  IS  RESPONSIBLE  FOR  COMPLYING  WITH  ALL  PERMIT  CONDITIONS. 					ADAPTERS  FOR  EACH  TANK  ARE  TO  BE  LOCATED  IN  THE  TURBINE  SUMP  0 THE  "J'     					EXCAVATION SHOWN ABOVE,WITH 1:261DE SLOPES.  APPROXIMATELY 100
<br />      																							ADDITIONAL  PERMITTING  WORK  BY  THE  CONTRACTOR  TO  BE  T  &  M  +  15%  ON   			BOX.   																				YARDS'WOULD BE REQUIRED.   THE SAME LAYOUT 16 ALSO SUITABLE FOR 							WEST  SCRAMENTO,  CA.  95691
<br />      																							ALL  FEES  PAID  (RECEIPTS  REQUIRED.)  																																PHILLIPS FIBERS CORP. '$UPAR' FBRIC.  4.1 OZ/S.Y. FABRIC IN ROLL'S      							Phone:     916-372-1985
<br />     																																								21.     INSTALL  NEW  CONCRETE  TANK  MAT AND  OTHER  CONCRETE AS  INDICATED  ON  SITE						15' WIDE BY 500' LONG.  FOR MON9ANTO 'SIDIM' C-22, 4 07/6.Y.
<br />     																						2.       GENERAL  CONTRACTOR  SHALL  PROTECT ALL  EXISTING  FACILITIES  TO  REMAIN				PLAN.    CONCRETE TO  BE  INSTALLED  ACCORDING  TO  TYPICAL  CONCRETE       							FABRIC IN n'-5'WIDE MATERIAL (984 FT. LONG ROLL)LAY 4 STRIPS								Fox:  	916-372-0911
<br />      																							UNLESS  NOTED  OTHERWISE.    CONTRACTOR  SHALL  REPAIR  OR  REPLACE  TO THE  			SPECIFICATIONS,    DRIVE  SLAB  TO  BE  6'  THICK.    TANK  SLAB  IS  TO  BE  12"  THICK.      					THE OPPOSITE DIRECTICN:  TWO BOTTOM PIECES AT APPROXIMATELY 69
<br />      																							SATISFACTION  OF THE  GONER  REPRESENTATIVE  ANY  EXISTING  FACILITIES      				SEE  SITE  PLAN  AND  DETAIL  SHEET.    CONCRETE  TO  CONTAIN  7  POUNDS  OF  LAMP						FEET LONG AND TWO SIDE PIECES AT APPROXIMATELY 62 FEET LONG      							DEVELOPER:
<br />      																							THAT ARE  DAMAGED  BY 1fHE  CONTRACTOR'S  OPERATIONS.    							BLACK  PER  CUBIC YARD.     																MODIFY A5 REQUIRED FOR OTHER THAN 3-10,000 GALLON V DIAMETER TANKS
<br /> 																																																																																		RIAZ   KHAN
<br />     																						3.      ALL  EXCAVATIONS  SHALL  BE  PERFORMED  IN  COMPLIANCE  WITH  OSHA  AND 			22.     INSTALL  NEW  WAYNE  580  FIXED-RATIO  BLENDING  DISPENSERS  AND  CONSOLES  AS
<br />      																							STATE  REGULATIONS.   THE  CONTRACTOR  IS  REFERRED  TO  THE  OSHA  BOOKLET,   			INDICATED  ON  SITE  PIAN  AND  DESCRIBED  IN  THE  EQUIPMENT  LIST.       				p    FL I TE R  FABRIC   INSTALLATION   DETAIL
<br />      																							EXCAVATING  AND  TRENCHING  OPERATIONS,  FOR  A  SAFE  WORK  PRACTICES  GUIDE   																				VCO
<br />      																							FOR  PERFORMING EXCAVATION  WORK.										23.     AFTER  THE  TANK  SLAB  IS  POURED THE  CONTRACTOR  SHALL  REAPPLY VACUUM  TO     																				SCALE=I'-IO'-O'      	3039  E.  NINTH  STREET
<br />       																																									THE TANK  ANNULAR  SPACE  AND  SHALL  MAKE  ARRANGEMENTS  FOR       																											STOCKTON,  CA.  95206
<br />     																						4.       UPON  COMPLETIONS  OF  PROJECT,  CONTRACTOR  SHALL  PROVIDE  SUTTON  &									TO  WITNESS  IT   																																Phone:     209-948-5967
<br />      																							ASSOCIATES  INC.  "AS  BUILT'  DRAWINGS  OF  ALL  ITEMS  INSTALLED  BY  SAME. 																																												Fox:  	209-462-6811
<br />      																							"AS  BUILT5"  SHALL  BE  COMPLETED  ON-SITE  WITH  INFORMATION  NOTED
<br />      																							DIRECTLY  ON APPROVED  JOB  COPY.  										24.     PATCH  PAVING:    																										TANK OR
<br />       																																									A.     ALL AREAS  TO  BE  PATCHED  MUST  BE  SQUARE CUT  WITH  PAVEMENT  BREAKER  OR													YARD 51_415											REVISIONS
<br />     																						5,       CONTRACTOR  SHALL  PROVIDE A WORK  SCHEDULE  TO  SUTTON  &  ASSOCIATES      																																			2  6
<br />      																							INC.  BEFORE  BEGINNING  WORK.  													CONCRETE  SAW.    																INTERRUPT      	FIBER EXPAN5ICN JOINT     								PETROMAT		NO.     DESCRIPTION   			DATE
<br />       																																									B.     EXCAVATE  ALL AREAS  TO  A  DEPTH  OF    6'  AND  REPLACE  WITH    2"  AC  OVER  4"   				REINFORCING  	MUST COMFORM TO ASTM
<br />       																																										CRUSH  ROCK  OR  CONCRETE  BASE.													AT JOINT		D 1151    								Py'NEW AC
<br />     																						6.       CONTRACTOR SHALL  PROVIDE A  LIST OF  SUB-CONTRACTORS,  IF ANY,  WHO  WILL   																								0'-   I/2'   							Y AC   		OVERLAY    	6AWCUT EDGE
<br />      																							BE  USED  ON  THE  PROJECT,       												C.     PATH  PAVE  FOR  DISTANCE  OF  2'  AROUND  ALL  NEW  CONCRETE  UNLESS  PETROMAT     													COMPACTED
<br />       																																										OVERLAY  IS  CALLED  FOR.
<br />     																						7.       CONTRACTOR  SHALL  COORDINATE  ALL  INSPECTIONS  AND  APPROVAL AND  OBTAIN,		25.     OWNER  WILL  HIRE  OTHERS TO  DO  TANK  AND  LINE  PRECISION  TESTING.
<br />      																							AT THE  COMPLETION  OF  THE  PROJECT, ALL  CERTIFICATES  REQUIRED  TO  RUN   																										'.°      						'`. '  •'	1•  ��;   +       ••
<br />     		a       																				THE  FACILITY.    														NOTE:      			ANY  ENVIRONMENTAL  WORK  REQUIRED  OUTSIDE  OF THE  ABOVE  				-  	e    	•-•.-� -
<br />    																																													SCOPE  OF WORK  SHALL  BE  DONE  ON  A   									, d 			v					�„_•rt,s••'r^�;•  .;     .. •;t..:,•�•j+!��+      61
<br />    																																													TIME  AND  MATERIALS  BASIS.    RENTAL  RECEIPTS,    										G    : 							: ns•;•�;"'�   	s; ,
<br />    																						SCOPE   OF   LJORK  																SUBCONTRACTOR  INVOICES,  MATERIAL   RECEIPTS,     												G							�-• +"y
<br />     		o    																																										AND  DAILY  LABOR  TIME  SHEETS  SHALL  BE  REQUIRED       																						EXISTING
<br />     		o-      																			1.       FENCE    OFF  WORK  AREA WITH  B'  HIGH  CHAIN  LINK  FENCE.    POST "KEEP  OUT'      						TO  SUPPORT  GENERAL  CONTRACTOR  TIME AND																								AC.
<br />      																							SIGNS  ON  FENCE  EVERY  30  FEET.    AT THE  END  OF  EACH  WORK  DAY SECURE       						MATERIAL  INVOICES.    SUCH  WORK  SHALL  BE  BILLED      																										DRAWINGS ISSUED FOR      DATE       APPROVED
<br />       																							FENCING  PANELS  TOGETHER.   																SEPARATELY  OR  AS  AGREED  BY  OWNER  &   												TOOL TO 114' RADIUS 													PLANNING REVIEW
<br />    																																													CONTRACTOR.  																																		BLDG. PERMIT
<br />     																						2.       FLUSH,  CUT,  AND  REMOVE  PRODUCT  LINES  FROM  EXISTING    END TO  DISPENSER
<br />       																							ISLANDS.     																																																								BID (NOT FOR CONST.)
<br />     		n
<br />																																																																																		CONSTRUCTION
<br />     																						3.       REMOVE  ALL  EXISTING  FUEL  DISPENSERS,  ISLANDS,  BARRICADES,  FUEL  LINES,
<br />      																							AND  CONCRETE  AND ASPHALT    SURFACES AS  REQUIRED,  IN  PREPARATION  FOR    																																											AS-BUILT DRAWINGS
<br />       																							INSTALLATION  OF  NEW AS  SHOWN  ON  DRAWINGS.    ANY  SALVAGEABLE
<br />       																							EQUIPMENT  TO  BE  REMOVED  FORM  SITE  AS  DIRECTED  BY  COINS  ENVIRONMENTAL. 																																											DRAWINGS PREPARED FOR:
<br />																																																											(EXPANSION   JOINT     		nASPHALT/GONG.   'fRAN.
<br />     		a     																			4.       INSTALL  SHORING  IN  TANK  HOLE AS  REQUIRED  (IF  REQUIRED,  AT  EXTRA  COST).    																					:cnoo:eruort+s.ewi    				SCALE.i'.I'•0'     v '  :cnne,arcnwe:accalc 				SCALE.1'.I'•0'      	KHAN   EXXON
<br />     																						5.       EXCAVATE  AS  NECESSARY  FOR THE  INSTALLATION  OF  REPLACEMENT TANKS.
<br />   																																																																										RAT24' O.C.
<br /> 																																																																									EACHWSERVICE   STATION
<br /> 																																																																									EACH WAY  (TYpICALJ
<br />     																						6.       OWNER  SHALL  PROVIDE  FOR  TRANSPORTATION  AND  DISPOSAL  OF  EXCAVATED
<br />       																							SOIL AFTER  COMPLETION  OF ANY NECESSARY  REMEDIATION,  INCLUDING  AERATION.
<br />     																						7.       CONTRACTOR  TO  DE-WATTER  HOLE AS  REQUIRED,    GROUNDWATER  IS AT  14  FT.																																					•'•
<br />       																							BELOW  GRADE.    OWNER  SHALL  PROVIDE  FOR  BAKER  TANK(S)  AND/OR VACUUM     																																		' •		_.4t ..
<br />       																							TRUCKS  AND  WILL  REMOIVE  BAKER TANK(S)  WATER  FROM  SITE.    OWNER  WILL      																																							, 	-
<br />   																																																														'3REBAR AT 24' O.C. 						•    				• •  '
<br />      																																																																								14
<br />       																							BE  RESPONSIBLE  FOR THE WATER  ONCE  IT  IS  PUMPED  INTO  THE TANK(S).    																								EACH WAY  (TYPICAL)   				9  				•       		•				437  N.  WILSON  WAY
<br />     																						&       INSTALL  FILTER  FABRIC  (LINER  IN  TANK  HOLE  PER  DRAWINGS.																																															STOCKTON
<br />     																						9.       INSTALL  1  EA.  20,000  GALLON  DOUBLE  WALL TANKS  SPLIT  INTO  2    10,000  PER																																		WET HOLE CONDITION     				CALIFORNIA
<br />    																																																																i,
<br />       																							DETAILS  ON  DRAWINGS AND  PER  MANUFACTURER'S  INSTRUCTIONS.   TANK																						,�   		= - -•�-c- - 		'
<br />       																							BEDDING  AND  BACKFILL  TO  BE  PEA  GRAVEL.    TANK  BURY  IS TO  BE  MINIMUM  5   																																		4REBAR AT 24' O.C.
<br />       																							FT.  TANK  BEDDING  IS TO  BE  A MINIMUM  12 																																									EACH WAY  (TYPICAL/ 					SHEET TITLE:
<br />      																						10.     INSTALL  EQUIPMENT  AS  LISTED  IN  EQUIPMENT  LIST.     																																																SITE
<br />      																						11.     INSTALL  NEW  FIBERGLASS  PRODUCT, VENT  &  VAPOR.  LINES  INSTALL  																							NOTE.   												,•    _• ••  	•�•  _    !'
<br />       																							ENVIROFLEX  FLEXIBLE  DOUBLE  WALL CONTAINMENT  LINES  PER  SITE  PLAN,    																																												DETAILS
<br />       																							STANDARD  TANK  DRAWINGS,  AND  PER  SCHEDULE  BELOW:   																									SEE SITE PLAN FOR SPECIFIC APPLICATION    			9  	•    	A    •       		•, 	p
<br />       																							VENT  PIPING  :    2"  RED  THREAD  IIA AND  REO  THREAD  II  FITTINGS,  DS  8000       																																											SCOPE/NOTES
<br />       																							SERIES ADHESIVE.      ALL  JOINTS  MUST  BE  CURED  USING  SMITH  FIBERGLASS       																																		DRY HOLE CONDITION
<br />       																							CHEM  CURE  PACKS.    HEATING  COLLARS  WILL  NOT  BE ALLOWED.
<br />       																							VENT  PIPING:   	SAME AS ABOVE.
<br />      																																																																						SEE 517E PLAN FOR SPECIFIC APPLICATION  				DATE:    OO-OO-OO 	SHEET N0.
<br />      		o       																				VAPOR  PIPING:	SAME  AS ABOVE  WITH  2"  AND  3"  PIPING AS  NOTED  ON 																																												PROJ.#:  90-0000
<br />      		o       																				PIANS
<br />       				DI  SSNERAL  NOTES   	SCOPE   OF   WORK      																																						nDRIVE  SLAB   DETAIL       	nTANK   SLAB   DETAIL   			SCALE: NOTED				1
<br />      					:CADD:6fIGOM9:0NNf8       																																															6CALEW.V-0'  I  								SCALEW-F-0'     	:cnoomrcaoMaxa    				SCALE.1'.1'-0'     	DRAWN BY: S,S,
<br /> 																																																																																		CHECKED BY: CK-BY 	SHT:  	OF:
<br />
								 |