My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2009-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
BILLING 2009-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 2:29:58 PM
Creation date
11/7/2018 12:02:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2009-2011
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1434\PR0231465\BILLING 2009-2011.PDF
QuestysFileName
BILLING 2009-2011
QuestysRecordDate
6/26/2017 6:06:28 PM
QuestysRecordID
3466389
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` IED PROGRAM CONSOLIDATED FOi& <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN M 2.CHANGE OF INFORMATION 49/-x, <br /> PLAN TYPE M 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1, <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> Tower Mart # 886 <br /> BUSINESS SITE ADDRESS 1434 W Yosemite Ave. 103. CITY Manteca ,CA 95337 IN, <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> y the equipment manufacturers',instructions,or annually,whichever is more frequent.Such work must be performed b ualified Mel.[23 CCR§2632,2634,2638,264 11 <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): a90-3b. <br /> III. MONITORING,LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632.2634] 4914. <br /> IV. ''TANK MONITORING IS PERFORMED''USING THE FOLLOWING METHODS hal am N) <br /> M 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.123 R§2632,26r_ l <br /> SECONDARY CONTAINMENT IS: a.DRY ® b.LIQUID FILLED Elc.PRESSURIZED ❑ d.UNDER VACUUM 490-6' <br /> PANEL MANUFACTURER: Veeder-Root 490-7. MODEL#: TLS350 4904' <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-9. MODEL#(s):848480-001 49x11. <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKISI.[23 CCR§2643] 490-11. <br /> PANEL MANUFACTURER: 49x12' MODEL#: 490-13' <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 4949y 14. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.[] 490.20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ 6 60 HOURS 49QII 7.1. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY Elb.BIENNIALLY ❑ c.OTHER(Specify) 490-24. <br /> : 490-25. <br /> 490-26. <br /> ❑ 99.OTHER(Specify): 491-7.7. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Checkall <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-2s. <br /> §1636] SECONDARY CONTAINMENT IS: M a.DRY Clb.LIQUID FILLED El c.PRESSURIZED El d.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:Veeder-Root 490-30. MODEL#: TLS 350 .7 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root °90.32' MODEL# 794390 2 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. 10 a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. M a.YES ❑ b.NO 490-35. <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLDMANUFACTURER(S): 490-37' MODEL#(S): 490-34. <br /> M 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490.39. <br /> ELLD MANUFACTURER(S):Veeder-Root 490,40' MODEL#(S): 848480-001 491-41. <br /> PROGRAMMED IN LINE LEAK TEST: [Ia.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. M a.YES ❑ b.NO 49"4'- <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. M a.YES ❑ b.NO 49040. <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490°.990,°6' <br /> ❑ 5.VISUAL PIPE MONITORING. - 490-44. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY M C.MM.MONTHLY&EACH TIME SYSTEM OPERATED. 49049. <br /> 'Aaowedfm m � .o°Y' RSNiOMreR � LH3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(.)(3)] 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ❑ <br /> 99.OTHER(Specify) 490-52. <br /> 490-53. <br /> UPCF UST-D(12/2007)-1/4 www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.