Laserfiche WebLink
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 E. Main St. • Stockton,CA 95202-3029 • Phone(209)468-3420 <br /> Donna Heran,R.E.H.S.,Director <br /> ENVIRONMENTAL HEALTH <br /> SAN JOAQUIN COUNTY CERTIFIED UNIFIED PROGRAM AGENCY <br /> PERMIT TO OPERATE <br /> Program Permit permit <br /> Record DO Number Program Code and Description Valid <br /> PRO514283 PT0010486 2220-SMALL QUANTITY HAZARDOUS WASTE GENERATOR FACILITY 1/1/2008 To 12/3112008 <br /> Hazardous Waste Generator Program: <br /> In order to maintain the permit to operate,Hazardous Waste Generators shall comply with California Health and Safety Code, Div.20,Chap.6.5,Art.2-13, <br /> Sec.251 t-Beq;: tU ___---- alifcmia Code of Regulations,Chap.20, <br /> --�—�-f-�-e---- ------ ----- - - - - - ....... <br /> R0231465 2300- NDERGROUND STORAGE TANK FACILITY 1/1/2008 To 12/31/2008 <br /> Untlernround Storage Tank P_toa <br /> Califo_r_nia Health_and Safety Code,Div_20,Chap.6.7 and Title 23,California Code of Regulations,Cha------------ --------------------------------:16_ ------ ----------- <br /> P/E Tank# Tank Record ID Permit# Capacity Contents Permit Status System Type Irak Detecdon <br /> 2362 4 390002314650146504 PT0004473 12,000 REGULAR UNLEADED Active,billable DOUBLE WALLED Continuous Interstitial Monitoring <br /> 2360 5 390002314650146505 PT0004483 10,000 MIDGRADE UNLEADED Active,billable DOUBLE WALLEDContinuous Interstitial Monitoring <br /> 2360 6 390002314650146506 PT0004485 8,000 PREMIUM UNLEADED Active,billable DOUBLE WALLED Continuous Interstitial Monitoring <br /> Underground Storage Tank Permit Conditions - <br /> 1) The Permit to Operate will became void if Annual Permit Fees and Service Fees are not paid and/or the UST system(s)fails to remain in compliance with these Permit Conditions. <br /> 2) In order to maintain the operating permit,the owner and operator shall comply with the H&S Cade,Div.20,Chap.6.7 and 6.75;and CCR,Title 23,Chap.16 and 18,as well as any conditions <br /> established by San Joaquin County. <br /> 3) If the Tank Operators)is different from the Tank Owner,or if the Pemrit to Operate is issued to a person other than the owner or operator of the tank;the Permittee shall ensure that both <br /> the Tank Owner and tank Operator receive a copy of the permit. <br /> 4) Written Monitoring Procedures and an Emergency Response Plan must be approved by the Environmental Health Department(EHD)and are considererd UST Permit Conditions. The approved <br /> monitoring,response,and plot plans shall be maintained onsite with the permit. <br /> 5) The Permittee shall comply with the monitoring procedures referenced in this permit. <br /> 6) The Permittee shall perform testing and preventive maintenance on all leak detection monitoring equipment annually,or mom frequently if specified by the equipment manufacturer,and <br /> provide documentation of such servicing to this office. <br /> 7) In the event of a spill,leak,or other unautbormed release,the Pernitee shall comply with the requirements of Title 23 CCR,Chap.16,Art.5,and the approved Emergency Response Plan. <br /> 8) Written records of all monitoring performed shall be maintained on-site by the operator and be available for inspection for a period of at least three years from the date the monitoring was <br /> performed. - <br /> 9) The EHD shall be notified of any change in ownership or operation ofthe UST system within 30 days of such change. <br /> 10) Upon any change in equipment,design or operation of the UST system(including change in tank contents or usage),the Permit to Operate will be subject to review,modification or <br /> revocation. <br /> 11) Construction,repair and/or removal permits are required from the EHD prior to any change,repair or removal of UST system equipment. <br /> 12) The Permittee shall submit an annual repel documenting compliance with the UST Pernit Conditions within 30 days of the date of the issuance of this pemdt. <br /> 13). This Permit to Operate shall not be considered permission to violate any laws,ordinances or statutes of any other Federal,State or Local agency. <br /> 14) A"Conditional"Permit may be revoked if corrections specified on the inspection report are not completed by the dam(s) indicated. <br /> PERMITS TO OPERATE are NOT TRANSFERABLE <br /> and may be SUSPENDED or REVOKED for cause. <br /> PERMIT(s)Valid only for: TOWER ENERGY GROUP <br /> THIS FORM MUST BE DISPLAYED CONSPICUOUSLY ON THE PREMISES <br /> Regulated Facility: TOWER MART#886 Facility ID FA0003739 <br /> 1434 W YOSEMITE AVE Account ID AR0008444 <br /> MANTECA CA 95336 Issued 3113/2008 <br /> Billing Address: ATTN TOWER ENERGY GROUP <br /> TOWER MART #886 <br /> 1983 W 190TH ST STE 100 <br /> TORRANCE CA 90504 <br /> 7028.81 <br />