Laserfiche WebLink
TANK COLLAR / <br /> 7 CONTAINMENT SUMP ADDITION PROCEDURE 1 <br /> 52" <br /> 42" <br /> WHITE GROUND AREA <br /> (ENTIRE ATTACHMENT ZONE) <br /> TANK COLLAR/CONTAINMENT SUMP POSITION <br /> LID WITH GASKET ON TURBINE SUMP ONLY <br /> STEP 1 <br /> TANK SURFACE PREPARATION i I <br /> � I I <br /> I <br /> DETAIL "C" I I I I <br /> � I I I I <br /> I I I I <br /> I I I I <br /> DETAIL "B" I I 1 1 <br /> I II I <br /> 3 LAYER LAY-UP OF MAT AND RESIN i 1 46" l <br /> � <br /> 2 _� 11 i I 2 <br /> I I I I <br /> TANK COLLAR/CONTAINMENT SUMP POSITION 1 <br /> I I I I <br /> I I <br /> DETAIL °A° <br /> STEP 2 I 1 <br /> INSTALLATION OF CONTAINMENT SUMP <br /> I II 11 1 7 <br /> I II 11 1 <br /> I I I I I I j <br /> I I I I I 1 <br /> I I I I I 1 <br /> I II 11 1 <br /> I I I I I I <br /> I 11 38 11 I <br /> I I I I I 1 { <br /> I I I I I 1 <br /> CONTAINMENT SUMP CONTAINMENT SUMP TOP HAT <br /> INSTALL TANK COLLAR/CONTAINMENT SUMP I I I 1 <br /> 1 I WdliI <br /> I II <br /> CONTAINMENT SUMPI 1 1 I <br /> 3 LAYER LAY-UP OF MAT BOTH INSIDE <br /> AND OUTSIDED TANK COLLAR/CONTAINMENT SUMP <br /> TWO LAYER LAY-UP OF 6" WIDE MAT <br /> WITH RESIN. BOTH INSIDE AND OUTSIDE CONTAINMENT SUMP <br /> FILLER PUTTY OF CONTAINMENT SUMP AND TOP HAT <br /> STEP 3 <br /> INSTALLATION OF TANK COLLAR/ <br /> 'S � FILLER PUTTY CONTAINMENT SUMP <br /> CONTAINMENT SUMP TOP HAT <br /> FILLER PUTTY <br /> FIRST 3 LAYER LAYUP OF MAT — <br /> TANK COLLAR/CONTAINMENT SUMP <br /> TWO LAYER LAY-UP OF 6" WIDE MAT TWO LAYER LAY-UP OF 6" WIDE MAT T 3 LAYER LAY-UP OF MAT BOTH INSIDE <br /> WITH RESIN. BOTH INSIDE AND OUTSIDE WITH RESIN. BOTH INSIDE AND OUTSIDE AND OUTSIDED TANK COLLAR/CONTAINMENT SUMP <br /> CONTAINMENT COLLAR X CONTAINMENT COLLAR <br /> 43" TANK COLLAR TWO LAYER LAY-UP OF 6" WIDE MAT <br /> WITH RESIN, BOTH INSIDE AND OUTSIDE <br /> CONTAINMENT COLLAR <br /> 43" TANK COLLAR <br /> i <br /> DETAIL A DETAIL "C " DETAIL "B " <br /> ATTACHMENT DETAIL FOR ATTACHMENT DETAIL FOR TOP HAT ATTACHMENT DETAIL CONTAINMENT SUMP <br /> XERXES TANK COLLAR 43" TANK COLLAR EXTENSION ATTACHMENT DETAIL <br /> Q REV DATE REVISED <br /> DESTROY &LPI S R KffyD �W° APPROVAL RECORD APPROVALS 4 <br /> I © UNION OIL OF CALIFORNIA, d'oa UNOCAL, 1994 „E M,7 ��& �""" � RIi CONTAINMENT S �J �IB INSTALLATION DETAIL <br /> THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN IS ISSUED FOR C.U.P. <br /> PROPRIETARY TO UNION OIL OF CALIFORNIA (UNOCAL) AND HAS <br /> BEEN FURNISHED IN CONFIDENCE AND ARE SUBJECT TO THE ISSUED FOR PLAN CHECK °� <br /> NQp” Qp1n°0 "� <br /> TERMS OF A SEPARATE SECRECY AGREEMENT BETWEEN UNOCAL <br /> AND THE RECIPIENT. THE RECIPIENT IS NOT TO COPY, DUPLICATE ISSUED FOR GEN. BID <br /> OR DISCLOSE THE CONTENTS TO ANY PERSON OR ENTITY EXCEPT ISSUED FOR CONSTRUCT. ah 2/18/97 � > rxuw b � T <br /> — <br /> AS EXPRESSLY AUTHORIZED BY SAID AGREEMENT OR BY UNOCAL PRODUCTS COMPANY <br /> J - 1 . 2OF - <br /> IN WRITING. RECORD DPAWINc s 3/4"—l' <br /> A B C D E E - - <br /> _ L1 <br />