Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> "ORESPONSE PLAN— PAGE 1 `" One toren perfacili ) <br /> Rol, <br /> TYPE OF ACTION ❑ 1.NEW PLAN ja 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID N (Agency Use Only) — — 1_ <br /> BUSINESS NAME(Same as FACILITY NAME) 3- <br /> Li9 )�r,Po ZZ- C-, <br /> BUSINESS SITE ADDRESS 103. BUSINESS SFM CITY 11a- <br /> r `G� Fi,I /T� <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> > If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shutoff,etc.)and if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> > Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary communicant system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 funds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to stoma water systems. <br /> > We will review secondary containment systema for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary commitment. <br /> III. SPELL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plm. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed Defective equipment is repaired m replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BI1T AVAILABLE FOR USE IF NEEDED: (Complete ly i a (icab(e <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RM R2a. Rao. <br /> RI 1, R21. RU. <br /> R12. M. M2. <br /> R13. R23. RU. <br /> R14. R24. R34. <br /> all. R25. R35. <br /> W. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Roo. TITLE Mo. <br /> uG <br /> NAME \ R41. TITLE <br /> NAME t/ R42. TITLE {c R52. <br /> NAME R43. TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> 1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ❑2. INSPECTION BY QUALIFIED PERSONS [13. RECALIBRATION OF EQUIPMENT Rha. <br /> ❑99. OTHER(Specify): R61. <br /> UN-022B-V3 www.unhIms.org Rev.04/02/08 <br />