Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> '`RESPONSE PLAN - PAGE 1 `� One farm par faciljyj <br /> anl. <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Ageray Use Only) I A41 -1 Q IV - <br /> 3. <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> MfWle(A Pn*'A � 103. BUSINESS SITE CITY IN. <br /> BUSINESS SITE ADDRESS <br /> (.� ` IOStAwTe 'AV M TCcR <br /> IL SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe in do so,facility,personnel will take immediate measures to control or stop any release(e.g.,activate pump shutoff,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system <br /> ➢ Any release to secondary containment will he purrWed or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used in contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended fm use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed Of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 fords that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick Boating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to Sierra water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions Occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released producdwaste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> IH. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SBUT AVAILABLE FOR USE IF NEEDED: Com lete nly i a licable <br /> EQUIPMENT11 LOCATION AVAILABILITY <br /> RIO. R20. R30. <br /> RI 1. R21. Ut. <br /> R12. M2. R32 <br /> R13. R23. M3. <br /> R14. R24. RH. <br /> RIS. R2$. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME S Roo. TITLE Rso. <br /> P FitPE <br /> NAME R41. TITLE Rsl. <br /> NAME R42. TITLE M2' <br /> NAME R43. TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ❑2. INSPECTION BY QUALIFFBiD PERSONS ❑3. RECALIBRATION OF EQUIPMENT <br /> R61. <br /> ❑99. OTHER(Specify): <br /> UN-022B-113 www,anldors,org Rev.0"2AM <br />