Laserfiche WebLink
D PROGRAM CONSOLIDATED FOIS <br /> TANKS <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 <br /> Pa e2of2 <br /> VI.PIPING CONSTRUCTION(Chak all that I,) ,=.(I x . RIM <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE ®1.PRESSURE ❑2.SUCTION ❑3.GRAVITY 458. ❑ 1.PRESSURE D 2.SUCTION ❑3.GRAVITY 459. <br /> CONSTRUCTION/ 1.SINGLE WALL ❑3.LINED TRENCH [199.OTHER 460. ❑ 1.SINGLE WALL ❑95.UNKNOWN 462. <br /> MANUFACTURER <br /> ®2.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER A.O. SMITH 461. MANUFACTURER 463. <br /> ❑1.BARE STEEL [16.FRP COMPATIBLE W/100%METHANOL ❑ L BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL <br /> ❑2.STAINLESS STEEL [17.GALVANIZED STEEL ❑2.STAINLESS STEEL [17.GALVANIZED STEEL <br /> ❑3.PLASTIC COMPATIBLE WITH CONTENTS ❑95.UNKNOWN ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑8.FLEXIBLE(HDPE) ❑99.OTHER <br /> ®4.FIBERGLASS ❑S.FLEXIBLE(HDPE) [199.OTHER ❑4.FIBERGLASS [19.CATHODIC PROTECTION <br /> ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTION 464. ❑5.STEEL W/COATING ❑95.UNKNOWN 465, <br /> VII:PIPING LEAK DETECTION(Check all i6eta I)(Adasailiovofthe it.dng incluan shall be submmed to the local menu.) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466. SINGLE WALL PIPING 467 <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> S . ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP [11. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION <br /> +AUDIBLE AND VISUAL ALARMS. +AUDIBLE AND VISUAL ALARMS. <br /> ❑2. MONTHLY 0.2 GPH TEST [12. MONTHLY 0.2 GPH TEST <br /> W. ANNUAL INTEGRITY TEST(0.I GPH) ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑4. DAILY VISUAL CHECK <br /> CONVENTIONAL.SUCTION SYSTEMS CONVENTIONAL.SUCTION SYSTEMS(Check all that apply) <br /> ❑5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL.PIPING El 5. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): ❑6. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> [17. SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW [17. SELF MONITORING <br /> D9. BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> ❑S. DAILY VISUAL MONITORING <br /> [39. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WTI AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSORWITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check one) <br /> ®a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ®b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> (]c. NO AUTO PUMP SHUT OFF ❑c. NO AUTO PUMP SHUT OFF <br /> ®11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT (] 11. AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) [112. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> [113. CONTANOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑ 13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> [114. CONTINUOUS SUMP SENSOR WIT AUTO PUMP SHUT OFF [114. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> ❑ 15. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW El 15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> ❑ 16. ANNUAL INTEGRITY TEST(0.1 GPH) ❑ 16. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑ 17. DAILY VISUAL CHECK ❑ 17. DAILY VISUAL CHECK <br /> VUL DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT 468. []1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ®4. DAILY VISUAL CHECK 469. <br /> DATE INSTALLED [12. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS [15. TRENCH/LINER MONITORING <br /> 1999 03. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR [16. NONE <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> SIGNATURE OF OWNER/OPERg1TOR DATE: 470 <br /> GYXV/ <br /> NAME OF OWNER/OPERA R(print): TITLE OF OWNER/OPERATOR: 472 <br /> - s: Of mAl <br /> Permit Number(Agency use only) 473 1 Permit Approved By(Agency use only) 474. 1 Permit Expiration Date(Agency use only) 475. <br /> UPCF hwfwre-b(1/99)-3/4 http://www.unidocs.org Rev.02/16/00 <br />