Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page I of 2) <br /> TYPE OF ACTION 1.NEW PLAN2.CHANGE OF INFORMATION 490­1 <br /> PLAN TYPE ,. 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490Q <br /> (Check one item only) ❑ 2.TMS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(SL <br /> I. FACII.ITY INFORMATION <br /> FACILITY ID#(Agency Use Only) ,tel <br /> BUSINESS NAME(Same as FACILITY NAME) S'�YE OA/ q(,,r�7 f- ,C1 ) <br /> BUSINESS SITE ADDRESS 4a F I/V OS�E�/Y)17� i/I/� to3 C� men11C C ./ uw. <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 42632,2634,2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY El 99,OTHER(Specify): 4%3b <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN..SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49oa <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 49-5 <br /> VAULTS)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 49P6 <br /> PANEL MANUFACTURER: OrMAU7EG 490.1. MODEL#: Oct_-7000 4908 <br /> LEAK SENSOR MANUFACTURER: or)?NTEL 490.4. MODEL#(S): tWG-et` 490.10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKIS).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 49-12. MODEL#: 49-13 <br /> IN-TANK PROBE MANUFACTURER: 09016 MODEL#(S): 49-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY 49°'16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 44-17 <br /> 49-18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2g.p.h. ❑ c.OTHER(Specify): 49x19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS [Ib.60 HOURS ay921 n <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.23 <br /> TEST FREQUENCY: ❑ &ANNUALLY ❑ b.BILNINIALLY ❑ c.OTHER(Specify): 49-24 <br /> 490.25 <br /> ❑99.OTHER (Specify): 490 26 <br /> 49-26 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:,5k.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490.29 <br /> PANEL MANUFACTURER: All 7 C a9-3o MODEL - Of7O 49-31 <br /> LEAK SENSOR MANUFACTURER: O✓hNTEL 90 <br /> 432 M #(S): -ODEL C 490.33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a YES ❑b.NO 49-34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES ❑b.NO 490.35 <br /> jjjj MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 49-36 <br /> MLLD MANUFACTURER(S): V+�PaIL�ESS E E?A20 m 29 MODEL#(5): q'q G3 Zptltl °ML a9-3e <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT RO INELY PERFORMS 3.0 gp.h.LEAK TESTS (23 CCR§2636) 490.39 <br /> ELLD MANUFACTURERS) °90'10 I MODEL#(S): 490-1 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490'44 <br /> 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FRE UENCY ❑ &ANNUALLY ❑ b.EVERY 3 YEARS c.OTHERS i 490-0649049 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49-49 <br /> •Allowed for monimn of unburied enaam fuel PIPORWYWHSC 281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(6)(3)1• 49-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 49-51 <br /> 490-52 <br /> ❑ 99.OTHER(Specify) a9os3 <br /> UPCF UST-D(12/2007)1/4 <br />