Laserfiche WebLink
FEE WO SHEET PER EACH FACILTT• <br /> FACILITY <br /> DBA 02� C'�9�Y ADDRESS /G161�r/TFcs� ���ycj<' `1� TTC <br /> MAILING ADDRESS Se/`rl, • / Mj T,?.?-JCC2 <br /> I. Operating Permit Application/Annual Inspection Fee <br /> a. First Tank at Facility @ $150. <br /> b. Additional Tanks (# Additional Tanks x $50) <br /> 2. State Surcharge (per tank) (Due with Permit Application, <br /> on renewal or amendment of operation permit and temporary closure) <br /> ($56 x Total # Tanks) <br /> 3• *Temporary Closure (per tank) Underground Storage Tank in which <br /> storage has ceased but where the owner/operator proposes to <br /> re-use rank within 51 ,,,cars. <br /> - . _. <br /> (#_ Temporary closures x $80) (See above #3 to calculate surcharge) <br /> 4• *Permanent Closure (per tank) Underground Storage Tank in which <br /> storage has ceased and where the owner/operator has no intent <br /> of re-using tank . <br /> (#_ Permanent Closures x $90) <br /> 5. Plan Check Fee $30. <br /> Total Number of Tanks v Total Fee Due <br /> Make all fees payable to San Joaquin Local Health District Enclose this worksheet <br /> with your check. <br /> EXAMPLE - Annual Fee for Facility with 4 Tanks <br /> (1 regular, 1 unleaded, 1 supreme, 1 waste oil ) <br /> Ia. Existing Facility & 1st Tank $150 <br /> b. 3 Additional Tanks x $50 150 <br /> 2. State Surcharge, 4 Tanks x $56 224 <br /> Total Number of Tanks -4 . Total Fee Due $524 <br /> *Both closures will be conditioned. Contact a Health District Representative. <br /> 2-86 <br /> 1 <br />