Laserfiche WebLink
RECEIVE® <br /> Monitoring System Certification JAN 21 2015 <br /> UST Monitoring Site Plan <br /> Site Address. Qulckl Khan Car Wash-707 Vosem"a Blvd—Manteca L <br /> .411 Pi <br /> . . . . . . srn <br /> . . . 77777;1 <br /> DIE . . . . . . . . . . . . . . . . . . . . <br /> . . . . F <br /> 5/ 1/2 <br /> p p <br /> 87 <br /> V <br /> • T xCar Wash Entrance. <br /> F <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 87 . . . . . . . . . . . . . . . . 7/8 . . . . . . . . 3/4 <br /> . . . . O . . . . . . . . X <br /> O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . <br /> O VENTS. . <br /> . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . <br /> 0. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> C <br /> p <br /> S (CAS Laying on side Style). . . . . . <br /> Date map was drawn'. 10-24-12. <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(d used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />