Laserfiche WebLink
Monitoring System Certification <br /> A Results of Testing/Servicing <br /> Software Version Installed: 5.00 <br /> Com tete the Lit dri checklist: <br /> ® Yes ❑ No* Is the audible alarm operational? <br /> Ir® Yes El No* Is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually inspected,functionally tested, and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br /> ® N/A operational? <br /> ® Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ® Sump/Trench Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ® Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> ® N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> A rtVP tips 511 point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? 90% <br /> LEOYes* <br /> No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment <br /> replaced and list the manufacturer name and model for all replacement parts in Section E,below. <br /> No Was liquid found inside any secondary containment systems designed as dry systcros? (Check all that a 1❑Product; N Water. If yes,describe causes in Section E,below. PPY) <br /> No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> No* 1 119 a ui mentoperational per manufacturer's s in ations? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Found water in the 87 STP sump. Removed rain water from sup & placed water into a HAZ drum <br /> already located on site. <br /> Page 2 of 4 <br /> UN-036-2/5 <br /> w v.unidomorg <br /> Rev.01/17108 <br />